IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,377

matching recommendations
Reset
SIC 29 Petroleum And Coal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LL0144 # 03 Y:2002 03 2002 INSULATE BARE EQUIPMENT $1,206 $361 Not Implemented
LL0144 # 04 Y:2002 04 2002 INSULATE BARE EQUIPMENT $807 $322 Implemented
LL0144 # 05 Y:2002 05 2002 USE PHOTOCELL CONTROLS $242 $104 Implemented
LL0137 # 01 Y:2002 01 2002 INSULATE BARE EQUIPMENT $50,444 $27,801 Not Implemented
LL0137 # 02 Y:2002 02 2002 INSULATE BARE EQUIPMENT $2,446 $1,992 Not Implemented
LL0137 # 03 Y:2002 03 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,946 $90 Implemented
LL0137 # 04 Y:2002 04 2002 USE PHOTOCELL CONTROLS $1,550 $104 Not Implemented
LL0137 # 05 Y:2002 05 2002 USE PHOTOCELL CONTROLS $1,123 $182 Implemented
LL0137 # 06 Y:2002 06 2002 USE PHOTOCELL CONTROLS $387 $26 Implemented
AS0316 # 01 Y:2002 01 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $11,660 $14,391 Implemented
AS0316 # 02 Y:2002 02 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,578 $3,816 Implemented
AS0316 # 03 Y:2002 03 2002 INSTALL OCCUPANCY SENSORS $194 $600 Not Implemented
AS0316 # 04 Y:2002 04 2002 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $1,995 $4,200 Not Implemented
AS0316 # 05 Y:2002 05 2002 UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS $14,828 $11,575 n/a
AS0316 # 06 Y:2002 06 2002 CLEAR AND RENT EXISTING SPACE $294,108 $3,024 Implemented
CO0486 # 01 Y:2001 01 2001 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $298,800 $962,500 Not Implemented
CO0486 # 02 Y:2001 02 2001 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $105,800 $28,000 n/a
CO0486 # 03 Y:2001 03 2001 OPTIMIZE PLANT POWER FACTOR $22,640 $68,400 Not Implemented
CO0486 # 04 Y:2001 04 2001 COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER $7,590 $10,000 Not Implemented
CO0486 # 05 Y:2001 05 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,140 $21,600 n/a
CO0486 # 06 Y:2001 06 2001 INSULATE BARE EQUIPMENT $2,490 $6,000 Not Implemented
CO0485 # 01 Y:2001 01 2001 INSULATE BARE EQUIPMENT $229,700 $118,560 Implemented
CO0485 # 02 Y:2001 02 2001 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $59,590 $30,000 n/a
CO0485 # 03 Y:2001 03 2001 CONVERT COMBUSTION EQUIPMENT TO BURN OIL $40,450 $30,000 Not Implemented
CO0485 # 04 Y:2001 04 2001 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $27,060 $28,000 Implemented