IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,466

matching recommendations
Reset
SIC 29 Petroleum And Coal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0426 # 08 Y:1998 08 1998 USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS $92,990 $250,000 Implemented
CO0426 # 09 Y:1998 09 1998 MAINTAIN CLEAN CONDITIONS BEFORE PAINTING $73,500 $200,000 Not Implemented
UM0124 # 01 Y:1998 01 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,424 $1,183 Implemented
UM0124 # 02 Y:1998 02 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,856 $10,304 Implemented
UM0124 # 03 Y:1998 03 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $426 $1,000 Not Implemented
UM0124 # 04 Y:1998 04 1998 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,583 $3,500 Not Implemented
UM0124 # 05 Y:1998 05 1998 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $17,113 $4,120 Not Implemented
UM0124 # 06 Y:1998 06 1998 ELIMINATE/REDUCE AN OPERATION $22,516 $9,600 Implemented
UM0124 # 07 Y:1998 07 1998 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $158,133 $30,000 Implemented
OD0109 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $612 $1,562 Implemented
OD0109 # 02 Y:1998 02 1998 INSULATE BARE EQUIPMENT $1,672 $3,000 Not Implemented
OD0109 # 03 Y:1998 03 1998 BURN WASTE OIL FOR HEAT $3,530 $6,245 Implemented
CO0411 # 01 Y:1998 01 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $290 $523 Implemented
CO0411 # 02 Y:1998 02 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,480 $100 Implemented
CO0411 # 03 Y:1998 03 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $460 $660 Not Implemented
CO0411 # 04 Y:1998 04 1998 USE IN-PROCESS RECYCLING WHENEVER POSSIBLE $102,860 $72,000 Implemented
CO0411 # 05 Y:1998 05 1998 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $68,610 $200,000 Not Implemented
CO0411 # 06 Y:1998 06 1998 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $26,243 $21,600 Implemented
CO0411 # 07 Y:1998 07 1998 REDUCE SCRAP PRODUCTION $8,840 $45,000 Not Implemented
CO0411 # 08 Y:1998 08 1998 INSTALL AUTOMATIC PACKING EQUIPMENT $143,520 $17,500 Implemented
AM0317 # 01 Y:1998 01 1998 RECOVER AND REUSE WASTE MATERIAL $35,800 $137,500 Not Implemented
AM0317 # 02 Y:1998 02 1998 OPTIMIZE PLANT POWER FACTOR $23,300 $25,000 Not Implemented
AM0317 # 03 Y:1998 03 1998 RECOVER AND REUSE WASTE MATERIAL $12,000 $410 Implemented
AM0317 # 04 Y:1998 04 1998 RECOVER AND REUSE WASTE MATERIAL $10,900 $9,000 Not Implemented
AM0317 # 05 Y:1998 05 1998 PAY UTILITY BILLS ON TIME $2,662 $0 Implemented