Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
36
matching recommendationsSIC | 2952 | Asphalt Felts And Coatings |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0703 # 05 Y:2018 | 05 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,955 | $4,730 | Implemented |
OR0703 # 04 Y:2018 | 04 | 2018 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $3,908 | $12,825 | Not Implemented |
OR0703 # 03 Y:2018 | 03 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,525 | $8,125 | Implemented |
OR0703 # 02 Y:2018 | 02 | 2018 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $7,797 | $13,333 | Implemented |
OR0703 # 01 Y:2018 | 01 | 2018 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $8,902 | $12,504 | Not Implemented |
OR0642 # 04 Y:2015 | 04 | 2015 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $5,825 | $22,383 | Not Implemented |
OR0642 # 01 Y:2015 | 01 | 2015 | MODIFY STARTUP/SHUTDOWN TIMES | $6,091 | $44,052 | Implemented |
OR0642 # 02 Y:2015 | 02 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $16,013 | $24,232 | Implemented |
OR0642 # 03 Y:2015 | 03 | 2015 | ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION | $46,293 | $100,000 | Not Implemented |
OR0642 # 05 Y:2015 | 05 | 2015 | ADJUST BURNERS FOR EFFICIENT OPERATION | $1,833 | $500 | Implemented |
OR0642 # 06 Y:2015 | 06 | 2015 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $64,347 | $61,077 | Not Implemented |
OR0642 # 07 Y:2015 | 07 | 2015 | INSULATE BARE EQUIPMENT | $898 | $2,015 | Implemented |
OR0431 # 05 Y:2003 | 05 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,241 | $7,250 | Not Implemented |
OR0431 # 04 Y:2003 | 04 | 2003 | INCREASE AMOUNT OF CONDENSATE RETURNED | $2,860 | $5,500 | Not Implemented |
OR0431 # 03 Y:2003 | 03 | 2003 | KEEP EQUIPMENT CLEAN | $5,590 | $4,000 | Not Implemented |
OR0431 # 02 Y:2003 | 02 | 2003 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $17,830 | $54,571 | Implemented |
OR0431 # 01 Y:2003 | 01 | 2003 | USE OPTIMUM TEMPERATURE | $7,341 | $1,900 | Not Implemented |
OR0294 # 11 Y:1997 | 11 | 1997 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $2,160 | $0 | Implemented |
OR0294 # 10 Y:1997 | 10 | 1997 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $11,700 | $22,500 | Not Implemented |
OR0294 # 01 Y:1997 | 01 | 1997 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $1,710 | $500 | Implemented |
OR0294 # 02 Y:1997 | 02 | 1997 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,320 | $500 | Implemented |
OR0294 # 03 Y:1997 | 03 | 1997 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,520 | $1,000 | Not Implemented |
OR0294 # 04 Y:1997 | 04 | 1997 | UPGRADE CONTROLS ON COMPRESSORS | $1,540 | $3,700 | Not Implemented |
OR0294 # 05 Y:1997 | 05 | 1997 | OPTIMIZE PLANT POWER FACTOR | $861 | $2,600 | Not Implemented |
OR0294 # 06 Y:1997 | 06 | 1997 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,133 | $3,516 | Implemented |