IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,818

matching recommendations
Reset
SIC 30 Rubber And Miscellaneous Plastics Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0408 # 03 Y:2002 03 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,370 $400 Implemented
AM0408 # 05 Y:2002 05 2002 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $2,965 $0 Implemented
AM0408 # 07 Y:2002 07 2002 PAY BILLS ON TIME TO AVOID LATE FEES $788 $0 Implemented
AM0408 # 08 Y:2002 08 2002 INSULATE BARE EQUIPMENT $500 $600 Implemented
UD0635 # 09 Y:2002 09 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $500 $1,800 Implemented
AM0406 # 01 Y:2002 01 2002 TURN OFF EQUIPMENT WHEN NOT IN USE $3,400 $1,600 Implemented
AM0406 # 02 Y:2002 02 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,975 $2,250 Implemented
AM0406 # 03 Y:2002 03 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,460 $200 Implemented
AM0406 # 04 Y:2002 04 2002 USE A RAG RECYCLE SERVICE $830 $0 Implemented
AM0406 # 05 Y:2002 05 2002 REUSE RAGS UNTIL COMPLETELY SOILED $830 $0 Implemented
AM0406 # 06 Y:2002 06 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $520 $320 Implemented
AM0406 # 07 Y:2002 07 2002 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $450 $1,035 Implemented
AM0405 # 04 Y:2002 04 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,330 $400 Implemented
AM0405 # 06 Y:2002 06 2002 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $560 $0 Implemented
SD0286 # 01 Y:2002 01 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,685 $320 Implemented
SD0286 # 03 Y:2002 03 2002 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,235 $1,000 Implemented
SD0286 # 04 Y:2002 04 2002 USE POWER DURING OFF-PEAK PERIODS $2,320 $0 Implemented
SD0286 # 06 Y:2002 06 2002 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $3,250 $0 Implemented
SD0286 # 07 Y:2002 07 2002 INSTALL OCCUPANCY SENSORS $2,292 $0 Implemented
SD0286 # 09 Y:2002 09 2002 USE EVAPORATION TO CONCENTRATE MATERIAL $540 $300 Implemented
SD0286 # 11 Y:2002 11 2002 INSTALL EQUIPMENT TO MOVE PRODUCT $9,000 $3,500 Implemented
SD0286 # 14 Y:2002 14 2002 OPTIMIZE LOT SIZES TO REDUCE INVENTORY CARRYING COSTS $3,348 $7,000 Implemented
SD0286 # 15 Y:2002 15 2002 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $4,380 $3,000 Implemented
SD0286 # 16 Y:2002 16 2002 CHANGE OPERATING CONDITIONS $2,333 $0 Implemented
CO0497 # 02 Y:2001 02 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,610 $22,110 Implemented