Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
7,818
matching recommendationsSIC | 30 | Rubber And Miscellaneous Plastics Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0628 # 03 Y:2001 | 03 | 2001 | OPTIMIZE PLANT POWER FACTOR | $17,969 | $9,000 | Implemented |
UD0628 # 05 Y:2001 | 05 | 2001 | INSULATE BARE EQUIPMENT | $11,223 | $7,600 | Implemented |
UD0628 # 07 Y:2001 | 07 | 2001 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $4,858 | $0 | Implemented |
UD0628 # 09 Y:2001 | 09 | 2001 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $4,097 | $3,200 | Implemented |
WV0220 # 01 Y:2001 | 01 | 2001 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,623 | $3,010 | Implemented |
WV0220 # 02 Y:2001 | 02 | 2001 | USE PHOTOCELL CONTROLS | $432 | $300 | Implemented |
WV0220 # 03 Y:2001 | 03 | 2001 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,633 | $540 | Implemented |
WV0220 # 04 Y:2001 | 04 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $804 | $54 | Implemented |
WV0220 # 05 Y:2001 | 05 | 2001 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $241 | $36 | Implemented |
WV0220 # 07 Y:2001 | 07 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,626 | $190 | Implemented |
WV0220 # 10 Y:2001 | 10 | 2001 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $4,164 | $1,080 | Implemented |
WV0218 # 02 Y:2001 | 02 | 2001 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $15,768 | $13,800 | Implemented |
WV0218 # 03 Y:2001 | 03 | 2001 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $1,519 | $1,362 | Implemented |
WV0218 # 04 Y:2001 | 04 | 2001 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $121 | $60 | Implemented |
WV0218 # 06 Y:2001 | 06 | 2001 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $5,713 | $1,440 | Implemented |
WV0218 # 07 Y:2001 | 07 | 2001 | INSULATE BARE EQUIPMENT | $1,985 | $276 | Implemented |
WV0218 # 08 Y:2001 | 08 | 2001 | INSULATE BARE EQUIPMENT | $3,625 | $730 | Implemented |
WV0218 # 09 Y:2001 | 09 | 2001 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $1,088 | $1,200 | Implemented |
WV0218 # 11 Y:2001 | 11 | 2001 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $18,480 | $9,000 | Implemented |
BD0189 # 07 Y:2001 | 07 | 2001 | MINIMIZE WATER USAGE | $1,633 | $100 | Implemented |
BD0189 # 08 Y:2001 | 08 | 2001 | MINIMIZE WATER USAGE | $429 | $1,550 | Implemented |
BD0189 # 10 Y:2001 | 10 | 2001 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $15,750 | $2,000 | Implemented |
UD0625 # 01 Y:2001 | 01 | 2001 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $22,708 | $55,000 | Implemented |
UD0625 # 02 Y:2001 | 02 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,972 | $315 | Implemented |
UD0625 # 03 Y:2001 | 03 | 2001 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $10,095 | $4,500 | Implemented |