IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

418

matching recommendations
Reset
SIC 30 Rubber And Miscellaneous Plastics Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TN0605 # 05 Y:1997 05 1997 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $10,880 $25,180 Not Implemented
TN0605 # 06 Y:1997 06 1997 REUSE / RECYCLE/ SELL RUBBER PRODUCTS $5,430 $14,800 Not Implemented
NC0109 # 01 Y:1997 01 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,734 $630 Implemented
NC0109 # 02 Y:1997 02 1997 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $6,491 $650 Not Implemented
NC0109 # 03 Y:1997 03 1997 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $6,246 $0 Not Implemented
NC0109 # 04 Y:1997 04 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $210 $402 Implemented
NC0109 # 05 Y:1997 05 1997 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $6,281 $1,200 Implemented
NC0109 # 06 Y:1997 06 1997 USE DISTILLATION, EVAPORATION TO REMOVE CONTAMINANTS $9,315 $30,000 Not Implemented
NC0109 # 07 Y:1997 07 1997 EXPAND OPERATIONS INTO UNUSED SPACE $3,436,000 $2,250,000 Not Implemented
NC0084 # 01 Y:1996 01 1996 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $20,895 $10,000 Implemented
NC0084 # 02 Y:1996 02 1996 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,441 $3,000 Implemented
NC0084 # 03 Y:1996 03 1996 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $9,833 $400 Implemented
NC0084 # 04 Y:1996 04 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,498 $1,700 Implemented
NC0084 # 05 Y:1996 05 1996 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,744 $600 Not Implemented
NC0084 # 06 Y:1996 06 1996 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $6,221 $5,100 Not Implemented
NC0084 # 07 Y:1996 07 1996 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,284 $640 Not Implemented
NC0084 # 08 Y:1996 08 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,827 $2,970 Implemented
NC0084 # 09 Y:1996 09 1996 INSULATE BARE EQUIPMENT $932 $549 Implemented
NC0084 # 10 Y:1996 10 1996 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $3,582 $4,720 Not Implemented
NC0084 # 11 Y:1996 11 1996 USE DEMAND CONTROLLER OR LOAD SHEDDER $1,960 $2,000 Implemented
NC0084 # 12 Y:1996 12 1996 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $25,015 $18,000 Implemented
NC0084 # 13 Y:1996 13 1996 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $20,000 $2,000 Not Implemented
NC0076 # 01 Y:1996 01 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $585 $210 Implemented
NC0076 # 02 Y:1996 02 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,856 $7,415 Not Implemented
NC0076 # 03 Y:1996 03 1996 USE POWER DURING OFF-PEAK PERIODS $5,153 $0 Implemented