IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

542

matching recommendations
Reset
SIC 30 Rubber And Miscellaneous Plastics Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0168 # 02 Y:2003 02 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,251 $0 Implemented
SU0168 # 03 Y:2003 03 2003 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,295 $0 Implemented
SU0168 # 04 Y:2003 04 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,662 $85 Not Implemented
SU0168 # 05 Y:2003 05 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,037 $227 Implemented
SU0168 # 06 Y:2003 06 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,579 $9,450 Not Implemented
SU0168 # 07 Y:2003 07 2003 MOVE BOILER TO MORE EFFICIENT LOCATION $5,735 $18,000 Not Implemented
SU0147 # 01 Y:2002 01 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,867 $39,847 Not Implemented
SU0147 # 02 Y:2002 02 2002 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $4,126 $7,590 Not Implemented
SU0147 # 03 Y:2002 03 2002 RECOVER WASTE HEAT FROM EQUIPMENT $3,432 $2,288 Not Implemented
SU0147 # 04 Y:2002 04 2002 OPTIMIZE PLANT POWER FACTOR $2,974 $8,850 Not Implemented
SU0147 # 05 Y:2002 05 2002 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,193 $1,528 Not Implemented
SU0147 # 06 Y:2002 06 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,104 $5,675 Not Implemented
SU0147 # 07 Y:2002 07 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,381 $437 Not Implemented
SU0147 # 08 Y:2002 08 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $694 $196 Not Implemented
SU0132 # 01 Y:2002 01 2002 USE OPTIMUM THICKNESS INSULATION $1,746 $0 Not Implemented
SU0132 # 02 Y:2002 02 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $6,727 $8,057 Implemented
SU0132 # 03 Y:2002 03 2002 INSTALL TIMERS AND/OR THERMOSTATS $5,704 $472 Implemented
SU0132 # 04 Y:2002 04 2002 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $5,586 $392 Implemented
SU0132 # 05 Y:2002 05 2002 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,123 $0 Implemented
SU0132 # 06 Y:2002 06 2002 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $451 $809 Not Implemented
SU0132 # 07 Y:2002 07 2002 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $357 $40 Not Implemented
SU0132 # 08 Y:2002 08 2002 RECOVER WASTE HEAT FROM EQUIPMENT $290 $107 Not Implemented
SU0132 # 09 Y:2002 09 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $154 $0 Implemented
SU0132 # 10 Y:2002 10 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $48 $79 Not Implemented
SU0133 # 01 Y:2002 01 2002 CHECK FOR ACCURACY OF UTILITY / POWER METERS $482 $0 Not Implemented