IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

536

matching recommendations
Reset
SIC 30 Rubber And Miscellaneous Plastics Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0680 # 03 Y:2004 03 2004 INSTALL SET-BACK TIMERS $26,433 $1,100 Not Implemented
OK0680 # 04 Y:2004 04 2004 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $19,697 $15,783 n/a
OK0680 # 05 Y:2004 05 2004 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST $3,154 $590 Implemented
OK0680 # 06 Y:2004 06 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $21,427 $28,713 Not Implemented
OK0680 # 07 Y:2004 07 2004 REDUCE FLUID FLOW RATES $38,434 $27,594 Not Implemented
OK0680 # 08 Y:2004 08 2004 INSTALL OCCUPANCY SENSORS $945 $479 Not Implemented
OK0680 # 09 Y:2004 09 2004 REPLACE THE CHLORINATION STAGE WITH AN OXYGEN OR OZONE STAGE $9,109 $36,000 Not Implemented
OK0671 # 01 Y:2003 01 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,945 $4,565 Implemented
OK0671 # 02 Y:2003 02 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,474 $12,625 n/a
OK0671 # 03 Y:2003 03 2003 INSULATE BARE EQUIPMENT $880 $318 Implemented
OK0671 # 04 Y:2003 04 2003 INSULATE BARE EQUIPMENT $459 $863 Implemented
OK0671 # 05 Y:2003 05 2003 INSULATE BARE EQUIPMENT $1,789 $5,340 Implemented
OK0671 # 06 Y:2003 06 2003 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,592 $9,500 Not Implemented
OK0671 # 07 Y:2003 07 2003 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $114,000 $86,000 Implemented
OK0658 # 01 Y:2003 01 2003 UPGRADE CONTROLS ON COMPRESSORS $51,704 $45,000 Implemented
OK0658 # 02 Y:2003 02 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $25,266 $0 Not Implemented
OK0658 # 03 Y:2003 03 2003 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $11,031 $0 Implemented
OK0658 # 04 Y:2003 04 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,978 $367 Implemented
OK0658 # 05 Y:2003 05 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,150 $5,273 Implemented
OK0658 # 06 Y:2003 06 2003 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $30,454 $60,000 Not Implemented
OK0658 # 07 Y:2003 07 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,028 $117 Not Implemented
OK0658 # 08 Y:2003 08 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,609 $30,876 Implemented
OK0658 # 09 Y:2003 09 2003 INSTALL OCCUPANCY SENSORS $6,270 $2,004 Implemented
OK0658 # 10 Y:2003 10 2003 REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY $7,445 $0 Not Implemented
OK0621 # 01 Y:2001 01 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,536 $13,800 Implemented