Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
445
matching recommendationsSIC | 30 | Rubber And Miscellaneous Plastics Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WI0454 # 05 Y:2003 | 05 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,128 | $1,980 | Implemented |
WI0454 # 06 Y:2003 | 06 | 2003 | INSTALL TIMERS AND/OR THERMOSTATS | $1,192 | $1,600 | Implemented |
WI0451 # 01 Y:2003 | 01 | 2003 | UPGRADE CONTROLS ON COMPRESSORS | $21,502 | $30,000 | Not Implemented |
WI0451 # 02 Y:2003 | 02 | 2003 | USE REVERSE OSMOSIS TO CONCENTRATE MATERIAL | $14,092 | $36,000 | Not Implemented |
WI0451 # 03 Y:2003 | 03 | 2003 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $9,847 | $3,433 | Not Implemented |
WI0451 # 04 Y:2003 | 04 | 2003 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,486 | $500 | Not Implemented |
WI0451 # 05 Y:2003 | 05 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $7,048 | $1,280 | Not Implemented |
WI0451 # 06 Y:2003 | 06 | 2003 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $2,005 | $1,400 | Not Implemented |
WI0451 # 07 Y:2003 | 07 | 2003 | INSULATE BARE EQUIPMENT | $754 | $294 | Not Implemented |
WI0438 # 01 Y:2003 | 01 | 2003 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $9,005 | $15,000 | Implemented |
WI0438 # 02 Y:2003 | 02 | 2003 | SHIP HYDRAULIC OIL TO SECONDARY FUEL PROGRAM | $4,455 | $5,000 | Implemented |
WI0438 # 03 Y:2003 | 03 | 2003 | IMPLEMENT A MACHINE AND COOLANT SUMP CLEANING PROGRAM TO MINIMIZE COOLANT CONTAMINATION | $2,640 | $8,000 | Not Implemented |
WI0438 # 04 Y:2003 | 04 | 2003 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,901 | $1,000 | Implemented |
WI0438 # 05 Y:2003 | 05 | 2003 | INSTALL TIMERS AND/OR THERMOSTATS | $1,793 | $2,800 | Implemented |
WI0438 # 06 Y:2003 | 06 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $353 | $120 | Implemented |
WI0438 # 07 Y:2003 | 07 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $261 | $640 | Not Implemented |
WI0436 # 01 Y:2003 | 01 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $28,363 | $102,600 | Not Implemented |
WI0436 # 02 Y:2003 | 02 | 2003 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $3,768 | $200 | Not Implemented |
WI0436 # 03 Y:2003 | 03 | 2003 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $3,276 | $1,424 | Not Implemented |
WI0436 # 04 Y:2003 | 04 | 2003 | INSTALL TIMERS AND/OR THERMOSTATS | $861 | $800 | Not Implemented |
WI0436 # 05 Y:2003 | 05 | 2003 | INSTALL OCCUPANCY SENSORS | $496 | $225 | Not Implemented |
WI0436 # 06 Y:2003 | 06 | 2003 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $212 | $272 | Not Implemented |
WI0436 # 07 Y:2003 | 07 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $119 | $34 | Implemented |
WI0419 # 01 Y:2002 | 01 | 2002 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $2,499 | $1,000 | Implemented |
WI0419 # 02 Y:2002 | 02 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,839 | $5,926 | Implemented |