IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

509

matching recommendations
Reset
SIC 30 Rubber And Miscellaneous Plastics Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0401 # 02 Y:2012 02 2012 INSTALL OCCUPANCY SENSORS $5,655 $21,250 Not Implemented
UM0401 # 03 Y:2012 03 2012 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $34,019 $5,000 Implemented
UM0401 # 04 Y:2012 04 2012 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $1,066 $448 Implemented
UA0080 # 01 Y:2012 01 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $18,321 $480 Implemented
UA0080 # 02 Y:2012 02 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,884 $6,195 Not Implemented
UA0080 # 03 Y:2012 03 2012 INSULATE BARE EQUIPMENT $15,904 $7,093 Not Implemented
UA0080 # 04 Y:2012 04 2012 INSTALL TIMERS AND/OR THERMOSTATS $981 $364 Implemented
UA0080 # 05 Y:2012 05 2012 INSTALL OCCUPANCY SENSORS $1,157 $1,443 Not Implemented
UA0080 # 06 Y:2012 06 2012 USE PHOTOCELL CONTROLS $632 $270 Implemented
IA0479 # 01 Y:2012 01 2012 INSTALL OCCUPANCY SENSORS $2,675 $2,732 Implemented
IA0479 # 02 Y:2012 02 2012 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,268 $549 Implemented
IA0479 # 03 Y:2012 03 2012 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $447 $752 Not Implemented
IA0479 # 04 Y:2012 04 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,057 $158 Implemented
IA0479 # 05 Y:2012 05 2012 REPOSITION OVEN WALLS TO REDUCE HEATED SPACE $400 $1,030 Not Implemented
IA0479 # 06 Y:2012 06 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $655 $3,430 Not Implemented
IA0479 # 07 Y:2012 07 2012 RECOVER WASTE HEAT FROM EQUIPMENT $1,014 $250 Not Implemented
IA0479 # 08 Y:2012 08 2012 DIRECT WARMEST AIR TO COMBUSTION INTAKE $234 $240 Not Implemented
NC0451 # 01 Y:2012 01 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,790 $14,320 Implemented
NC0451 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $444 $1,674 Implemented
NC0451 # 03 Y:2012 03 2012 INSTALL OCCUPANCY SENSORS $252 $533 Implemented
NC0451 # 04 Y:2012 04 2012 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $2,656 $1,800 Not Implemented
NC0451 # 05 Y:2012 05 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,516 $4,075 Implemented
NC0451 # 06 Y:2012 06 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $158 $100 Implemented
WV0445 # 01 Y:2012 01 2012 UPGRADE CONTROLS ON COMPRESSORS $10,833 $29,500 Not Implemented
WV0445 # 02 Y:2012 02 2012 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $9,398 $1,000 Not Implemented