IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

91

matching recommendations
Reset
SIC 30 Rubber And Miscellaneous Plastics Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0179 # 07 Y:1999 07 1999 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $500 $0 Implemented
NC0179 # 04 Y:1999 04 1999 RECOVER WASTE HEAT FROM EQUIPMENT $164 $800 Not Implemented
NC0179 # 03 Y:1999 03 1999 ADD AREA LIGHTING SWITCHES $121 $640 Not Implemented
NC0179 # 02 Y:1999 02 1999 USE PHOTOCELL CONTROLS $128 $120 Not Implemented
NC0179 # 01 Y:1999 01 1999 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $453 $340 Implemented
NC0179 # 05 Y:1999 05 1999 USE COUNTER CURRENT RINSING TO REDUCE WASTE WATER $4,315 $1,425 Implemented
TN0638 # 07 Y:1998 07 1998 INSTALL / REPAIR INSULATION ON STEAM LINES $120 $390 Implemented
TN0638 # 06 Y:1998 06 1998 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $920 $560 Implemented
TN0638 # 05 Y:1998 05 1998 INCREASE AMOUNT OF CONDENSATE RETURNED $7,220 $6,550 Implemented
TN0638 # 04 Y:1998 04 1998 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $7,990 $0 Implemented
TN0638 # 03 Y:1998 03 1998 MAKE A NEW BY-PRODUCT $17,500 $68,200 Not Implemented
TN0638 # 02 Y:1998 02 1998 INITIATE A PROGRAM TO ACQUIRE ISO CERTIFICATION $88,890 $200,000 Not Implemented
TN0638 # 01 Y:1998 01 1998 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $580,000 $27,200 Implemented
GT0628 # 01 Y:1997 01 1997 STORE HEATED/ COOLED WATER FOR USE DURING PEAK DEMAND PERIODS $86,500 $120,000 n/a
GT0628 # 02 Y:1997 02 1997 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $186,200 $245,000 n/a
GT0628 # 03 Y:1997 03 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,903 $37,960 n/a
GT0628 # 04 Y:1997 04 1997 RECOVER WASTE HEAT FROM EQUIPMENT $4,263 $5,550 n/a
GT0628 # 05 Y:1997 05 1997 MINIMIZE WATER USAGE $2,924 $0 n/a
GT0628 # 06 Y:1997 06 1997 REPLACE THE CHLORINATION STAGE WITH AN OXYGEN OR OZONE STAGE $23,066 $72,100 n/a
GT0628 # 07 Y:1997 07 1997 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $37,000 $0 n/a
TN0535 # 01 Y:1994 01 1994 USE RADIANT HEATER FOR SPOT HEATING $10,406 $28,960 Not Implemented
TN0535 # 14 Y:1994 14 1994 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $13,077 $10,000 Not Implemented
TN0535 # 02 Y:1994 02 1994 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $9,687 $660 Implemented
TN0535 # 03 Y:1994 03 1994 TURN OFF EQUIPMENT WHEN NOT IN USE $5,456 $0 Implemented
TN0535 # 05 Y:1994 05 1994 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $1,943 $0 Not Implemented