IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

82

matching recommendations
Reset
SIC 30 Rubber And Miscellaneous Plastics Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0152 # 07 Y:2019 07 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,480 $3,445 Not Implemented
UU0152 # 06 Y:2019 06 2019 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $1,817 $3,415 Implemented
UU0152 # 05 Y:2019 05 2019 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $2,562 $4,000 Not Implemented
UU0152 # 03 Y:2019 03 2019 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $10,938 $2,000 Implemented
UU0152 # 02 Y:2019 02 2019 RECOVER AND REUSE WASTE MATERIAL $12,915 $9,000 Implemented
UU0152 # 01 Y:2019 01 2019 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $33,354 $66,174 Not Implemented
UU0152 # 08 Y:2019 08 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,208 $231 Implemented
UU0144 # 04 Y:2019 04 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,420 $128 Implemented
UU0144 # 03 Y:2019 03 2019 OPTIMIZE PLANT POWER FACTOR $6,190 $6,000 Not Implemented
UU0144 # 02 Y:2019 02 2019 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $16,349 $400 Implemented
UU0144 # 01 Y:2019 01 2019 INSULATE BARE EQUIPMENT $42,296 $1,068 Implemented
UU0122 # 03 Y:2017 03 2017 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $15,162 $26,440 Not Implemented
UU0122 # 01 Y:2017 01 2017 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $204,798 $0 Not Implemented
UU0122 # 02 Y:2017 02 2017 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $55,559 $500 Implemented
UU0122 # 04 Y:2017 04 2017 UPGRADE CONTROLS ON COMPRESSORS $7,349 $800 Implemented
UU0122 # 06 Y:2017 06 2017 INSULATE BARE EQUIPMENT $5,324 $11,240 Not Implemented
UU0122 # 07 Y:2017 07 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,745 $0 Not Implemented
UU0122 # 05 Y:2017 05 2017 INSTALL OCCUPANCY SENSORS $6,799 $4,244 Implemented
UU0048 # 06 Y:2003 06 2003 REPAIR OR REPLACE STEAM TRAPS $16,294 $5,000 Not Implemented
UU0048 # 01 Y:2003 01 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,985 $306 Not Implemented
UU0048 # 02 Y:2003 02 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $440 $432 Not Implemented
UU0048 # 03 Y:2003 03 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $14,920 $40,000 Not Implemented
UU0048 # 04 Y:2003 04 2003 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $19,330 $9,176 Implemented
UU0048 # 05 Y:2003 05 2003 DIRECT WARMEST AIR TO COMBUSTION INTAKE $1,040 $947 Not Implemented
UU0048 # 07 Y:2003 07 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $480 $0 Not Implemented