IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

16,964

matching recommendations
Reset
SIC 30 Rubber And Miscellaneous Plastics Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0220 # 06 Y:2002 06 2002 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $1,928 $2,400 Not Implemented
UM0220 # 07 Y:2002 07 2002 USE DEMAND CONTROLLER OR LOAD SHEDDER $6,690 $10,000 Not Implemented
SD0301 # 01 Y:2002 01 2002 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $30,135 $58,000 Not Implemented
SD0301 # 02 Y:2002 02 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,968 $320 Not Implemented
SD0301 # 03 Y:2002 03 2002 INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS $3,733 $1,000 Not Implemented
SD0301 # 04 Y:2002 04 2002 INSTALL OCCUPANCY SENSORS $2,775 $6,000 Not Implemented
SD0301 # 05 Y:2002 05 2002 INSULATE BARE EQUIPMENT $2,690 $1,200 Not Implemented
SD0301 # 06 Y:2002 06 2002 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $1,586 $1,000 Not Implemented
SD0301 # 07 Y:2002 07 2002 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $1,584 $2,000 Not Implemented
SD0301 # 08 Y:2002 08 2002 INCREASE USE OF AUTOMATION $51,000 $50,000 Not Implemented
IA0292 # 01 Y:2002 01 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,757 $1,256 Implemented
IA0292 # 02 Y:2002 02 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,700 $264 Implemented
IA0292 # 03 Y:2002 03 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,277 $688 Not Implemented
IA0292 # 04 Y:2002 04 2002 INSTALL OCCUPANCY SENSORS $347 $509 Not Implemented
IA0292 # 05 Y:2002 05 2002 $133,875 $21,450 Not Implemented
IA0292 # 06 Y:2002 06 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $18,372 $5,765 Not Implemented
BD0213 # 01 Y:2002 01 2002 HEAT TREAT PARTS ONLY TO REQUIRED SPECIFICATIONS OR STANDARDS $40,151 $138,000 Not Implemented
BD0213 # 02 Y:2002 02 2002 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $29,490 $10,000 Implemented
BD0213 # 03 Y:2002 03 2002 INSTALL AUTOMATIC STACK DAMPER $12,416 $15,000 Not Implemented
BD0213 # 04 Y:2002 04 2002 INSTALL TURBULATORS $3,780 $2,194 Not Implemented
BD0213 # 05 Y:2002 05 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,926 $0 Implemented
BD0213 # 06 Y:2002 06 2002 INSTALL SKYLIGHTS $2,793 $11,150 Implemented
BD0213 # 07 Y:2002 07 2002 INSTALL OCCUPANCY SENSORS $1,056 $600 Implemented
BD0213 # 08 Y:2002 08 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $349 $352 Not Implemented
BD0213 # 09 Y:2002 09 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $170 $400 Implemented