IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

17,378

matching recommendations
Reset
SIC 30 Rubber And Miscellaneous Plastics Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0517 # 07 Y:2002 07 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,164 $2,500 Implemented
MA0517 # 08 Y:2002 08 2002 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $853 $1,515 Implemented
UD0650 # 01 Y:2002 01 2002 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $99,990 $64,500 Not Implemented
UD0650 # 02 Y:2002 02 2002 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $37,195 $95,000 Not Implemented
UD0650 # 03 Y:2002 03 2002 RECOVER WASTE HEAT FROM EQUIPMENT $24,914 $12,000 Not Implemented
UD0650 # 04 Y:2002 04 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $799 $2,372 Not Implemented
UD0650 # 05 Y:2002 05 2002 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $213 $0 Implemented
UD0650 # 06 Y:2002 06 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $133 $15 Not Implemented
UD0650 # 07 Y:2002 07 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $131 $406 Not Implemented
UM0220 # 01 Y:2002 01 2002 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $12,258 $25,000 Not Implemented
UM0220 # 02 Y:2002 02 2002 MAINTAIN MACHINES TO REDUCE LEAKS $7,380 $1,150 Implemented
UM0220 # 03 Y:2002 03 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $973 $1,700 Implemented
UM0220 # 04 Y:2002 04 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,947 $2,064 Not Implemented
UM0220 # 05 Y:2002 05 2002 AIR CONDITION ONLY SPACE NECESSARY $4,385 $800 Not Implemented
UM0220 # 06 Y:2002 06 2002 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $1,928 $2,400 Not Implemented
UM0220 # 07 Y:2002 07 2002 USE DEMAND CONTROLLER OR LOAD SHEDDER $6,690 $10,000 Not Implemented
SD0301 # 01 Y:2002 01 2002 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $30,135 $58,000 Not Implemented
SD0301 # 02 Y:2002 02 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,968 $320 Not Implemented
SD0301 # 03 Y:2002 03 2002 INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS $3,733 $1,000 Not Implemented
SD0301 # 04 Y:2002 04 2002 INSTALL OCCUPANCY SENSORS $2,775 $6,000 Not Implemented
SD0301 # 05 Y:2002 05 2002 INSULATE BARE EQUIPMENT $2,690 $1,200 Not Implemented
SD0301 # 06 Y:2002 06 2002 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $1,586 $1,000 Not Implemented
SD0301 # 07 Y:2002 07 2002 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $1,584 $2,000 Not Implemented
SD0301 # 08 Y:2002 08 2002 INCREASE USE OF AUTOMATION $51,000 $50,000 Not Implemented
IA0292 # 01 Y:2002 01 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,757 $1,256 Implemented