Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,765
matching recommendationsSIC | 30 | Rubber And Miscellaneous Plastics Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0648 # 04 Y:2002 | 04 | 2002 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $2,749 | $2,500 | Not Implemented |
UD0648 # 05 Y:2002 | 05 | 2002 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,235 | $7,600 | Not Implemented |
UD0648 # 06 Y:2002 | 06 | 2002 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,108 | $196 | Implemented |
UD0648 # 07 Y:2002 | 07 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,899 | $5,800 | Implemented |
UD0648 # 08 Y:2002 | 08 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $989 | $2,502 | Implemented |
WV0233 # 01 Y:2002 | 01 | 2002 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $3,670 | $1,375 | Implemented |
WV0233 # 02 Y:2002 | 02 | 2002 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,719 | $624 | Not Implemented |
WV0233 # 03 Y:2002 | 03 | 2002 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $2,145 | $7,000 | Not Implemented |
WV0233 # 04 Y:2002 | 04 | 2002 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $988 | $272 | Implemented |
WV0233 # 05 Y:2002 | 05 | 2002 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,409 | $3,500 | Not Implemented |
WV0233 # 06 Y:2002 | 06 | 2002 | INSTALL SPECTRAL REFLECTORS / DELAMP | $616 | $720 | Implemented |
WV0233 # 07 Y:2002 | 07 | 2002 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $2,395 | $1,590 | Implemented |
WV0233 # 08 Y:2002 | 08 | 2002 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $11,333 | $900 | Implemented |
WV0233 # 09 Y:2002 | 09 | 2002 | INSTALL OCCUPANCY SENSORS | $3,539 | $750 | Not Implemented |
WV0233 # 10 Y:2002 | 10 | 2002 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $19,934 | $1,800 | Implemented |
WV0233 # 11 Y:2002 | 11 | 2002 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $934 | $50 | Implemented |
WV0233 # 12 Y:2002 | 12 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,023 | $10,350 | Implemented |
WV0233 # 13 Y:2002 | 13 | 2002 | BURN WASTE OIL FOR HEAT | $7,659 | $2,960 | Not Implemented |
WV0233 # 14 Y:2002 | 14 | 2002 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $1,875 | $740 | Not Implemented |
WV0233 # 15 Y:2002 | 15 | 2002 | REUSE / RECYCLE/ SELL PAPER PRODUCTS | $4,800 | $50 | Implemented |
WV0233 # 16 Y:2002 | 16 | 2002 | MODIFY WORKLOAD | $28,611 | $5,200 | Not Implemented |
UD0635 # 01 Y:2002 | 01 | 2002 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $73,991 | $0 | Not Implemented |
UD0635 # 02 Y:2002 | 02 | 2002 | INSULATE BARE EQUIPMENT | $12,374 | $2,380 | Not Implemented |
UD0635 # 03 Y:2002 | 03 | 2002 | FILTER AND REUSE HYDRAULIC OIL | $5,357 | $3,323 | Not Implemented |
UD0635 # 04 Y:2002 | 04 | 2002 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $2,701 | $0 | Not Implemented |