Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
17,100
matching recommendationsSIC | 30 | Rubber And Miscellaneous Plastics Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0087 # 06 Y:1996 | 06 | 1996 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $6,158 | $12,000 | Not Implemented |
WV0087 # 07 Y:1996 | 07 | 1996 | INSULATE BARE EQUIPMENT | $7,466 | $1,085 | Implemented |
WV0087 # 08 Y:1996 | 08 | 1996 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $82,766 | $960 | Not Implemented |
SF0084 # 01 Y:1996 | 01 | 1996 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $606 | $464 | Implemented |
SF0084 # 02 Y:1996 | 02 | 1996 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,317 | $2,110 | Implemented |
SF0084 # 03 Y:1996 | 03 | 1996 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $981 | $810 | Implemented |
SF0084 # 04 Y:1996 | 04 | 1996 | USE IN-PROCESS RECYCLING WHENEVER POSSIBLE | $1,134 | $100 | Not Implemented |
MA0358 # 01 Y:1996 | 01 | 1996 | SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE | $3,000 | $2,800 | Not Implemented |
MA0358 # 02 Y:1996 | 02 | 1996 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $2,147 | $4,650 | Not Implemented |
MA0358 # 03 Y:1996 | 03 | 1996 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,080 | $0 | Not Implemented |
MA0358 # 04 Y:1996 | 04 | 1996 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $742 | $1,100 | Not Implemented |
MA0358 # 05 Y:1996 | 05 | 1996 | MINIMIZE CONDENSER COOLING WATER TEMPERATURE | $377 | $0 | Not Implemented |
NC0084 # 01 Y:1996 | 01 | 1996 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $20,895 | $10,000 | Implemented |
NC0084 # 02 Y:1996 | 02 | 1996 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,441 | $3,000 | Implemented |
NC0084 # 03 Y:1996 | 03 | 1996 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $9,833 | $400 | Implemented |
NC0084 # 04 Y:1996 | 04 | 1996 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,498 | $1,700 | Implemented |
NC0084 # 05 Y:1996 | 05 | 1996 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,744 | $600 | Not Implemented |
NC0084 # 06 Y:1996 | 06 | 1996 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $6,221 | $5,100 | Not Implemented |
NC0084 # 07 Y:1996 | 07 | 1996 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,284 | $640 | Not Implemented |
NC0084 # 08 Y:1996 | 08 | 1996 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $3,827 | $2,970 | Implemented |
NC0084 # 09 Y:1996 | 09 | 1996 | INSULATE BARE EQUIPMENT | $932 | $549 | Implemented |
NC0084 # 10 Y:1996 | 10 | 1996 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $3,582 | $4,720 | Not Implemented |
NC0084 # 11 Y:1996 | 11 | 1996 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $1,960 | $2,000 | Implemented |
NC0084 # 12 Y:1996 | 12 | 1996 | USE COOLING TOWER WATER INSTEAD OF REFRIGERATION | $25,015 | $18,000 | Implemented |
NC0084 # 13 Y:1996 | 13 | 1996 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $20,000 | $2,000 | Not Implemented |