IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,765

matching recommendations
Reset
SIC 30 Rubber And Miscellaneous Plastics Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0589 # 01 Y:2000 01 2000 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE $240,319 $400,000 Not Implemented
UD0589 # 02 Y:2000 02 2000 EXPAND OPERATIONS INTO UNUSED SPACE $35,731 $0 Not Implemented
UD0589 # 03 Y:2000 03 2000 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $34,765 $0 Implemented
UD0589 # 04 Y:2000 04 2000 RECOVER WASTE HEAT FROM EQUIPMENT $5,192 $640 Implemented
UD0589 # 05 Y:2000 05 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,943 $6,246 Not Implemented
UD0589 # 06 Y:2000 06 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,077 $4,500 Not Implemented
UD0581 # 01 Y:1999 01 1999 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $370,588 $40,000 Implemented
UD0581 # 02 Y:1999 02 1999 REUSE / RECYCLE/ SELL PAPER PRODUCTS $27,501 $6,000 Not Implemented
UD0581 # 03 Y:1999 03 1999 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $6,000 $0 Not Implemented
UD0581 # 04 Y:1999 04 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $918 $200 Not Implemented
UD0579 # 01 Y:1999 01 1999 INSTALL AUTOMATIC PACKING EQUIPMENT $250,000 $325,000 Not Implemented
UD0579 # 02 Y:1999 02 1999 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $25,726 $7,500 Implemented
UD0579 # 03 Y:1999 03 1999 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $9,050 $8,000 Implemented
UD0579 # 04 Y:1999 04 1999 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $7,690 $2,850 Implemented
UD0579 # 05 Y:1999 05 1999 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,782 $2,000 Not Implemented
UD0579 # 06 Y:1999 06 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $910 $0 Implemented
UD0567 # 01 Y:1999 01 1999 INSTALL AUTOMATIC PACKING EQUIPMENT $1,501,920 $1,075,000 Implemented
UD0567 # 02 Y:1999 02 1999 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $1,154,672 $1,100,000 Not Implemented
UD0567 # 03 Y:1999 03 1999 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $32,400 $90,000 Implemented
UD0567 # 04 Y:1999 04 1999 USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS $18,000 $30,000 Not Implemented
UD0567 # 05 Y:1999 05 1999 UPGRADE CONTROLS ON COMPRESSORS $7,855 $2,508 Implemented
UD0567 # 06 Y:1999 06 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,178 $9,800 Implemented
UD0566 # 01 Y:1999 01 1999 REUSE / RECYCLE/ SELL RUBBER PRODUCTS $110,878 $86,000 Not Implemented
UD0566 # 02 Y:1999 02 1999 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $59,980 $6,380 Implemented
UD0566 # 03 Y:1999 03 1999 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $53,332 $0 Not Implemented