IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,765

matching recommendations
Reset
SIC 30 Rubber And Miscellaneous Plastics Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0566 # 04 Y:1999 04 1999 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $19,000 $0 Not Implemented
UD0566 # 05 Y:1999 05 1999 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $14,598 $15,000 Implemented
UD0566 # 06 Y:1999 06 1999 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $10,800 $0 Not Implemented
UD0566 # 07 Y:1999 07 1999 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,524 $0 Not Implemented
UM0132 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,280 $7,301 Implemented
UM0132 # 02 Y:1999 02 1999 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $680 $700 Implemented
UM0132 # 03 Y:1999 03 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $667 $300 Implemented
UM0132 # 04 Y:1999 04 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $349 $1,000 Implemented
UM0132 # 05 Y:1999 05 1999 RECOVER WASTE HEAT FROM EQUIPMENT $815 $990 Implemented
UM0132 # 06 Y:1999 06 1999 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $13,503 $3,700 Implemented
UM0132 # 07 Y:1999 07 1999 USE LOW VOC OR WATER BASED PAINT $5,439 $500 Implemented
UM0132 # 08 Y:1999 08 1999 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $53,333 $1,548 Not Implemented
WV0135 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,412 $224 Implemented
WV0135 # 02 Y:1998 02 1998 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $2,926 $1,105 Not Implemented
WV0135 # 03 Y:1998 03 1998 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $300 $0 Implemented
WV0135 # 04 Y:1998 04 1998 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $2,310 $5,000 Not Implemented
WV0135 # 05 Y:1998 05 1998 CONTRACT A WOOD PALLET RECYCLING COMPANY $2,880 $53 Implemented
WV0135 # 06 Y:1998 06 1998 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $2,756 $250 Not Implemented
WV0135 # 07 Y:1998 07 1998 EXPAND OPERATIONS INTO UNUSED SPACE $2,400 $840 Implemented
UM0114 # 01 Y:1998 01 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,627 $3,217 Implemented
UM0114 # 02 Y:1998 02 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,918 $17,712 Implemented
UM0114 # 03 Y:1998 03 1998 USE RADIANT HEATER FOR SPOT HEATING $1,806 $192 Not Implemented
UM0114 # 04 Y:1998 04 1998 $22,312 $2,560 Not Implemented
UM0114 # 05 Y:1998 05 1998 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $22,600 $2,400 Implemented
UM0114 # 06 Y:1998 06 1998 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $16,900 $33,000 Not Implemented