IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

17,096

matching recommendations
Reset
SIC 30 Rubber And Miscellaneous Plastics Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0524 # 05 Y:2019 05 2019 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $19,167 $89,865 Not Implemented
UF0524 # 06 Y:2019 06 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,978 $400 Implemented
UF0524 # 07 Y:2019 07 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,897 $0 Implemented
UF0524 # 08 Y:2019 08 2019 ISOLATE HOT OR COLD EQUIPMENT $4,945 $5,090 Not Implemented
UF0524 # 09 Y:2019 09 2019 TREAT AND REUSE RINSE WATERS $17,615 $0 Implemented
IP0114 # 01 Y:2019 01 2019 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,085 $0 Not Implemented
IP0114 # 02 Y:2019 02 2019 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $591 $0 Not Implemented
IP0114 # 03 Y:2019 03 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $245 $10 Implemented
IP0114 # 04 Y:2019 04 2019 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $3,320 $480 Not Implemented
IP0114 # 05 Y:2019 05 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,093 $150 Implemented
IP0114 # 06 Y:2019 06 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $681 $680 Not Implemented
IP0114 # 07 Y:2019 07 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,152 $20,160 Implemented
IP0114 # 08 Y:2019 08 2019 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $2,040 $4,200 Not Implemented
SD0577 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,725 $9,775 Implemented
SD0577 # 02 Y:2019 02 2019 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,772 $9,367 Implemented
SD0577 # 03 Y:2019 03 2019 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $2,459 $2,540 Not Implemented
SD0577 # 04 Y:2019 04 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,125 $0 Not Implemented
SD0577 # 05 Y:2019 05 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,306 $875 Not Implemented
SD0577 # 06 Y:2019 06 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $645 $400 Implemented
SD0575 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,276 $7,083 Not Implemented
SD0575 # 02 Y:2019 02 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,233 $600 Implemented
SD0575 # 03 Y:2019 03 2019 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,476 $4,242 Not Implemented
SD0575 # 04 Y:2019 04 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $718 $0 Implemented
SD0575 # 05 Y:2019 05 2019 INSTALL OCCUPANCY SENSORS $441 $540 Not Implemented
SD0575 # 06 Y:2019 06 2019 INSULATE BARE EQUIPMENT $142 $218 Not Implemented