IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

418

matching recommendations
Reset
SIC 30 Rubber And Miscellaneous Plastics Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0748 # 04 Y:2003 04 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,314 $2,844 n/a
GT0748 # 05 Y:2003 05 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,272 $17,760 n/a
GT0748 # 06 Y:2003 06 2003 USE OPTIMUM TEMPERATURE $76,382 $16,640 n/a
GT0748 # 07 Y:2003 07 2003 UTILIZE A LESS EXPENSIVE COOLING METHOD $22,400 $22,800 n/a
GT0748 # 08 Y:2003 08 2003 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $810,975 $4,250,000 n/a
NC0261 # 01 Y:2003 01 2003 DEVELOP A REPAIR/REPLACE POLICY $10,483 $9,992 Implemented
NC0261 # 02 Y:2003 02 2003 RECOVER WASTE HEAT FROM EQUIPMENT $17,622 $2,911 Not Implemented
NC0261 # 03 Y:2003 03 2003 INSULATE BARE EQUIPMENT $13,615 $5,261 Not Implemented
NC0261 # 04 Y:2003 04 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,891 $50 Implemented
NC0261 # 05 Y:2003 05 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,466 $6,430 Implemented
NC0261 # 06 Y:2003 06 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,314 $500 Not Implemented
NC0261 # 07 Y:2003 07 2003 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $910 $3,948 Not Implemented
NC0261 # 08 Y:2003 08 2003 MODIFY CURRENT INCENTIVE PROGRAM $406,000 $41,000 Not Implemented
NC0259 # 01 Y:2003 01 2003 INSULATE BARE EQUIPMENT $7,357 $1,650 Implemented
NC0259 # 02 Y:2003 02 2003 DEVELOP A REPAIR/REPLACE POLICY $3,711 $5,940 Implemented
NC0259 # 03 Y:2003 03 2003 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $6,070 $0 Not Implemented
NC0259 # 04 Y:2003 04 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,905 $50 Implemented
NC0259 # 05 Y:2003 05 2003 USE PHOTOCELL CONTROLS $4,513 $2,750 Not Implemented
NC0259 # 06 Y:2003 06 2003 ADD AREA LIGHTING SWITCHES $3,306 $1,200 Not Implemented
NC0259 # 07 Y:2003 07 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $887 $862 Implemented
NC0259 # 08 Y:2003 08 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,879 $1,740 Implemented
NC0259 # 09 Y:2003 09 2003 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $13,286 $10,000 Not Implemented
NC0259 # 10 Y:2003 10 2003 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $2,785 $12,240 Implemented
NC0259 # 11 Y:2003 11 2003 MAKE ICE DURING OFF PEAK HOURS FOR COOLING $3,651 $38,000 Not Implemented
NC0253 # 01 Y:2003 01 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $81,956 $105,000 n/a