Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
556
matching recommendationsSIC | 30 | Rubber And Miscellaneous Plastics Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
GT0692 # 01 Y:2000 | 01 | 2000 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $7,357 | $2,000 | Implemented |
GT0692 # 02 Y:2000 | 02 | 2000 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $7,810 | $1,000 | Implemented |
GT0692 # 03 Y:2000 | 03 | 2000 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,690 | $4,000 | Implemented |
GT0692 # 04 Y:2000 | 04 | 2000 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $3,465 | $500 | Not Implemented |
GT0692 # 05 Y:2000 | 05 | 2000 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $53,500 | $170,000 | Not Implemented |
GT0692 # 06 Y:2000 | 06 | 2000 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $9,831 | $26,400 | Not Implemented |
GT0692 # 07 Y:2000 | 07 | 2000 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $19,321 | $41,750 | Not Implemented |
GT0692 # 08 Y:2000 | 08 | 2000 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $5,155 | $0 | Not Implemented |
GT0689 # 01 Y:2000 | 01 | 2000 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $32,450 | $0 | n/a |
GT0689 # 02 Y:2000 | 02 | 2000 | REPROCESS SPENT OILS ON SITE FOR RE-USE | $9,458 | $8,900 | n/a |
GT0689 # 03 Y:2000 | 03 | 2000 | INSTALL AUTOMATIC PACKING EQUIPMENT | $72,000 | $112,000 | n/a |
GT0689 # 04 Y:2000 | 04 | 2000 | ADD ADDITIONAL PRODUCTION SHIFT | $336,000 | $225,000 | n/a |
GT0689 # 05 Y:2000 | 05 | 2000 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,495 | $2,000 | n/a |
GT0689 # 06 Y:2000 | 06 | 2000 | REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS | $82,231 | $0 | n/a |
GT0689 # 07 Y:2000 | 07 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,460 | $32,400 | n/a |
GT0689 # 08 Y:2000 | 08 | 2000 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $16,070 | $61,209 | n/a |
GT0689 # 09 Y:2000 | 09 | 2000 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,228 | $0 | n/a |
GT0689 # 10 Y:2000 | 10 | 2000 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $17,362 | $72,500 | n/a |
GT0685 # 01 Y:2000 | 01 | 2000 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $5,280 | $0 | Implemented |
GT0685 # 02 Y:2000 | 02 | 2000 | REPROCESS SPENT OILS ON SITE FOR RE-USE | $13,650 | $11,650 | Implemented |
GT0685 # 03 Y:2000 | 03 | 2000 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $714 | $500 | Implemented |
GT0685 # 04 Y:2000 | 04 | 2000 | UPGRADE CONTROLS ON COMPRESSORS | $28,840 | $7,000 | Implemented |
GT0685 # 05 Y:2000 | 05 | 2000 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $15,955 | $0 | Implemented |
GT0685 # 06 Y:2000 | 06 | 2000 | INITIATE A TOTAL QUALITY MANAGEMENT PROGRAM | $93,536 | $30,000 | Not Implemented |
GT0685 # 07 Y:2000 | 07 | 2000 | INSTALL AUTOMATIC PACKING EQUIPMENT | $144,500 | $150,000 | Not Implemented |