IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

556

matching recommendations
Reset
SIC 30 Rubber And Miscellaneous Plastics Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0692 # 01 Y:2000 01 2000 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $7,357 $2,000 Implemented
GT0692 # 02 Y:2000 02 2000 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $7,810 $1,000 Implemented
GT0692 # 03 Y:2000 03 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,690 $4,000 Implemented
GT0692 # 04 Y:2000 04 2000 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $3,465 $500 Not Implemented
GT0692 # 05 Y:2000 05 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $53,500 $170,000 Not Implemented
GT0692 # 06 Y:2000 06 2000 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $9,831 $26,400 Not Implemented
GT0692 # 07 Y:2000 07 2000 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $19,321 $41,750 Not Implemented
GT0692 # 08 Y:2000 08 2000 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $5,155 $0 Not Implemented
GT0689 # 01 Y:2000 01 2000 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $32,450 $0 n/a
GT0689 # 02 Y:2000 02 2000 REPROCESS SPENT OILS ON SITE FOR RE-USE $9,458 $8,900 n/a
GT0689 # 03 Y:2000 03 2000 INSTALL AUTOMATIC PACKING EQUIPMENT $72,000 $112,000 n/a
GT0689 # 04 Y:2000 04 2000 ADD ADDITIONAL PRODUCTION SHIFT $336,000 $225,000 n/a
GT0689 # 05 Y:2000 05 2000 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,495 $2,000 n/a
GT0689 # 06 Y:2000 06 2000 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $82,231 $0 n/a
GT0689 # 07 Y:2000 07 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,460 $32,400 n/a
GT0689 # 08 Y:2000 08 2000 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $16,070 $61,209 n/a
GT0689 # 09 Y:2000 09 2000 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,228 $0 n/a
GT0689 # 10 Y:2000 10 2000 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $17,362 $72,500 n/a
GT0685 # 01 Y:2000 01 2000 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,280 $0 Implemented
GT0685 # 02 Y:2000 02 2000 REPROCESS SPENT OILS ON SITE FOR RE-USE $13,650 $11,650 Implemented
GT0685 # 03 Y:2000 03 2000 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $714 $500 Implemented
GT0685 # 04 Y:2000 04 2000 UPGRADE CONTROLS ON COMPRESSORS $28,840 $7,000 Implemented
GT0685 # 05 Y:2000 05 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $15,955 $0 Implemented
GT0685 # 06 Y:2000 06 2000 INITIATE A TOTAL QUALITY MANAGEMENT PROGRAM $93,536 $30,000 Not Implemented
GT0685 # 07 Y:2000 07 2000 INSTALL AUTOMATIC PACKING EQUIPMENT $144,500 $150,000 Not Implemented