IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,765

matching recommendations
Reset
SIC 30 Rubber And Miscellaneous Plastics Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0566 # 06 Y:2018 06 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,581 $575 Implemented
WV0566 # 07 Y:2018 07 2018 MINIMIZE WATER USAGE $1,217 $3,150 Implemented
WV0566 # 08 Y:2018 08 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,023 $500 Not Implemented
WV0566 # 09 Y:2018 09 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $595 $50 Implemented
WV0566 # 10 Y:2018 10 2018 INSULATE BARE EQUIPMENT $114 $180 Implemented
WV0563 # 01 Y:2018 01 2018 UPGRADE CONTROLS ON COMPRESSORS $85,272 $36,000 Not Implemented
WV0563 # 02 Y:2018 02 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $83,489 $54,000 Not Implemented
WV0563 # 03 Y:2018 03 2018 RECOVER WASTE HEAT FROM EQUIPMENT $35,888 $173,323 Not Implemented
WV0563 # 04 Y:2018 04 2018 DEVELOP A REPAIR/REPLACE POLICY $20,002 $754 Implemented
WV0563 # 05 Y:2018 05 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,206 $59,750 Not Implemented
WV0563 # 06 Y:2018 06 2018 MINIMIZE WATER USAGE $1,202 $1,400 Implemented
WV0563 # 07 Y:2018 07 2018 INSULATE BARE EQUIPMENT $264 $235 Implemented
UD0988 # 01 Y:2018 01 2018 TURN OFF EQUIPMENT WHEN NOT IN USE $6,505 $0 Not Implemented
UD0988 # 02 Y:2018 02 2018 USE OPTIMUM THICKNESS INSULATION $2,434 $2,072 Not Implemented
UD0988 # 03 Y:2018 03 2018 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $7,256 $3,172 Not Implemented
UD0988 # 04 Y:2018 04 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $291 $0 Not Implemented
UD0988 # 05 Y:2018 05 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,805 $2,571 Not Implemented
UD0988 # 06 Y:2018 06 2018 INSTALL OCCUPANCY SENSORS $1,216 $595 Not Implemented
UD0988 # 07 Y:2018 07 2018 USE IN-PROCESS RECYCLING WHENEVER POSSIBLE $22,500 $20,000 Not Implemented
UD0988 # 08 Y:2018 08 2018 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $5,857 $11,500 Not Implemented
UD0988 # 09 Y:2018 09 2018 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $3,857 $6,000 Not Implemented
UD0986 # 01 Y:2018 01 2018 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $28,289 $0 Not Implemented
UD0986 # 02 Y:2018 02 2018 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $8,337 $0 Not Implemented
UD0986 # 03 Y:2018 03 2018 TURN OFF EQUIPMENT WHEN NOT IN USE $37,147 $0 Not Implemented
UD0986 # 04 Y:2018 04 2018 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $467 $0 Not Implemented