IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

82

matching recommendations
Reset
SIC 30 Rubber And Miscellaneous Plastics Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0219 # 06 Y:2023 06 2023 INSTALL ISOLATION TRANSFORMER ON ADJUSTABLE FREQUENCY DRIVE $1,035 $729 Not Implemented
UU0219 # 01 Y:2023 01 2023 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $242,311 $1,768,555 Not Implemented
UU0219 # 05 Y:2023 05 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $1,272 $172 Not Implemented
UU0219 # 02 Y:2023 02 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,112 $13,345 Implemented
UU0219 # 03 Y:2023 03 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,350 $2,350 Not Implemented
UU0219 # 04 Y:2023 04 2023 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,850 $18,236 Not Implemented
UU0214 # 02 Y:2023 02 2023 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $4,069 $17,638 Implemented
UU0214 # 04 Y:2023 04 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,274 $495 Implemented
UU0214 # 01 Y:2023 01 2023 OPTIMIZE PLANT POWER FACTOR $14,031 $23,302 Implemented
UU0214 # 06 Y:2023 06 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $550 $1,558 Implemented
UU0214 # 03 Y:2023 03 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $2,776 $6,969 Implemented
UU0214 # 08 Y:2023 08 2023 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $23,820 $214,625 Not Implemented
UU0214 # 05 Y:2023 05 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $701 $1,150 Not Implemented
UU0214 # 07 Y:2023 07 2023 STORE HEATED/ COOLED WATER FOR USE DURING PEAK DEMAND PERIODS $24,046 $226,100 Not Implemented
UU0204 # 04 Y:2022 04 2022 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $7,347 $5,215 Not Implemented
UU0204 # 10 Y:2022 10 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $825 $900 Not Implemented
UU0204 # 09 Y:2022 09 2022 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $1,637 $1,536 Not Implemented
UU0204 # 08 Y:2022 08 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,260 $3,781 Not Implemented
UU0204 # 07 Y:2022 07 2022 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,552 $4,497 Not Implemented
UU0204 # 06 Y:2022 06 2022 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $4,228 $2,448 Not Implemented
UU0204 # 05 Y:2022 05 2022 UPGRADE CONTROLS ON COMPRESSORS $4,414 $1,000 Not Implemented
UU0204 # 03 Y:2022 03 2022 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT $10,674 $25,650 Not Implemented
UU0204 # 02 Y:2022 02 2022 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $13,275 $12,600 Not Implemented
UU0204 # 01 Y:2022 01 2022 TURN OFF EQUIPMENT WHEN NOT IN USE $45,240 $17,600 Not Implemented
UU0190 # 01 Y:2021 01 2021 INSULATE BARE EQUIPMENT $9,772 $5,582 Not Implemented