IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

258

matching recommendations
Reset
SIC 301 Tires And Inner Tubes
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TN0535 # 11 Y:1994 11 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $209 $179 Implemented
TN0535 # 12 Y:1994 12 1994 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $154,581 $34,400 Not Implemented
TN0535 # 13 Y:1994 13 1994 USE A DIFFERENT OR RECYCLED RAW MATERIAL $19,814 $15,400 Not Implemented
TN0535 # 14 Y:1994 14 1994 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $13,077 $10,000 Not Implemented
TN0535 # 15 Y:1994 15 1994 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $3,451 $0 Implemented
AR0019 # 01 Y:1994 01 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,832 $450 Implemented
AR0019 # 02 Y:1994 02 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,270 $1,996 Implemented
AR0019 # 03 Y:1994 03 1994 REPAIR AND ELIMINATE STEAM LEAKS $8,858 $2,200 Implemented
AR0019 # 04 Y:1994 04 1994 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $15,987 $1,177 Implemented
AR0019 # 05 Y:1994 05 1994 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $29,704 $0 Not Implemented
AR0019 # 06 Y:1994 06 1994 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $22,243 $47,000 Not Implemented
SF0015 # 01 Y:1993 01 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $10,029 $9,608 Implemented
SF0015 # 02 Y:1993 02 1993 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $8,821 $20,000 Not Implemented
SF0015 # 03 Y:1993 03 1993 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,452 $1,650 Implemented
SF0015 # 04 Y:1993 04 1993 USE PHOTOCELL CONTROLS $2,119 $1,068 Not Implemented
SF0015 # 05 Y:1993 05 1993 INSULATE BARE EQUIPMENT $1,767 $1,062 Implemented
SF0015 # 06 Y:1993 06 1993 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,540 $400 Implemented
SF0015 # 07 Y:1993 07 1993 INSTALL / REPAIR INSULATION ON STEAM LINES $1,416 $906 Implemented
SF0015 # 08 Y:1993 08 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,406 $3,719 Implemented
SF0015 # 09 Y:1993 09 1993 USE SYNTHETIC LUBRICANT $1,098 $0 Implemented
SF0015 # 10 Y:1993 10 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,030 $1,824 Implemented
SF0015 # 11 Y:1993 11 1993 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $612 $162 Implemented
WI0096 # 01 Y:1990 01 1990 BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT $77,488 $400,000 Not Implemented
WI0096 # 02 Y:1990 02 1990 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $27,714 $0 Not Implemented
WI0096 # 03 Y:1990 03 1990 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $8,473 $3,895 Implemented