IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,181

matching recommendations
Reset
SIC 305 Hose & Belting & Gaskets & Packing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0268 # 08 Y:2004 08 2004 INSTALL OCCUPANCY SENSORS $784 $1,320 Not Implemented
BD0268 # 09 Y:2004 09 2004 USE PHOTOCELL CONTROLS $605 $240 Not Implemented
BD0268 # 10 Y:2004 10 2004 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $461 $20 Implemented
BD0268 # 11 Y:2004 11 2004 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $15,653 $6,914 Implemented
BD0268 # 12 Y:2004 12 2004 USE LESS WASTEFUL PACKAGING $1,586 $3,600 Implemented
BD0268 # 13 Y:2004 13 2004 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $861 $173 Implemented
UM0267 # 01 Y:2004 01 2004 RECOVER AND REUSE WASTE MATERIAL $27,320 $10,000 Not Implemented
UM0267 # 02 Y:2004 02 2004 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $15,684 $2,400 Not Implemented
UM0267 # 03 Y:2004 03 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,675 $20,137 Implemented
UM0267 # 04 Y:2004 04 2004 OPTIMIZE PLANT POWER FACTOR $11,902 $21,150 Implemented
UM0267 # 05 Y:2004 05 2004 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $6,938 $2,615 Implemented
UM0267 # 06 Y:2004 06 2004 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $4,119 $1,300 Not Implemented
UM0267 # 07 Y:2004 07 2004 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,390 $200 Not Implemented
UM0267 # 08 Y:2004 08 2004 USE OPTIMUM THICKNESS INSULATION $3,274 $1,985 Not Implemented
UM0267 # 09 Y:2004 09 2004 INSTALL OCCUPANCY SENSORS $711 $736 Not Implemented
SD0350 # 01 Y:2004 01 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,900 $0 Implemented
SD0350 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,815 $250 Implemented
SD0350 # 03 Y:2004 03 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,353 $1,650 Implemented
SD0350 # 04 Y:2004 04 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,013 $20,872 Implemented
SD0350 # 05 Y:2004 05 2004 ADD AREA LIGHTING SWITCHES $11,915 $500 Implemented
UF0334 # 01 Y:2003 01 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,397 $57,060 Implemented
UF0334 # 02 Y:2003 02 2003 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $1,095 $2,128 Implemented
UF0334 # 03 Y:2003 03 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $13,612 $0 Implemented
UF0334 # 04 Y:2003 04 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,681 $376 Implemented
UF0334 # 05 Y:2003 05 2003 SEGREGATE SPENT SOLVENTS AND REUSE IN SUBSEQUENT WASHINGS $33,833 $43,600 Implemented