IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

459

matching recommendations
Reset
SIC 3052 Rubber & Plastics Hose & Belting
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0334 # 01 Y:2003 01 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,397 $57,060 Implemented
UF0334 # 02 Y:2003 02 2003 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $1,095 $2,128 Implemented
UF0334 # 03 Y:2003 03 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $13,612 $0 Implemented
UF0334 # 04 Y:2003 04 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,681 $376 Implemented
UF0334 # 05 Y:2003 05 2003 SEGREGATE SPENT SOLVENTS AND REUSE IN SUBSEQUENT WASHINGS $33,833 $43,600 Implemented
UF0334 # 06 Y:2003 06 2003 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $82,333 $168,000 Implemented
UU0048 # 01 Y:2003 01 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,985 $306 Not Implemented
UU0048 # 02 Y:2003 02 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $440 $432 Not Implemented
UU0048 # 03 Y:2003 03 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $14,920 $40,000 Not Implemented
UU0048 # 04 Y:2003 04 2003 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $19,330 $9,176 Implemented
UU0048 # 05 Y:2003 05 2003 DIRECT WARMEST AIR TO COMBUSTION INTAKE $1,040 $947 Not Implemented
UU0048 # 06 Y:2003 06 2003 REPAIR OR REPLACE STEAM TRAPS $16,294 $5,000 Not Implemented
UU0048 # 07 Y:2003 07 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $480 $0 Not Implemented
UU0048 # 08 Y:2003 08 2003 INSTALL / REPAIR INSULATION ON STEAM LINES $493 $518 Not Implemented
UU0048 # 09 Y:2003 09 2003 RECOVER AND REUSE COOLING WATER $9,920 $7,907 Not Implemented
UU0048 # 10 Y:2003 10 2003 REUSE / RECYCLE/ SELL RUBBER PRODUCTS $1 $0 Not Implemented
MA0517 # 01 Y:2002 01 2002 COVER OPEN TANKS $30,107 $4,262 Implemented
MA0517 # 02 Y:2002 02 2002 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $11,697 $33,800 Not Implemented
MA0517 # 03 Y:2002 03 2002 USE MINIMUM SAFE OVEN VENTILATION $7,427 $2,100 Implemented
MA0517 # 04 Y:2002 04 2002 PAY BILLS ON TIME TO AVOID LATE FEES $6,528 $0 Implemented
MA0517 # 05 Y:2002 05 2002 INSULATE BARE EQUIPMENT $6,349 $9,636 Implemented
MA0517 # 06 Y:2002 06 2002 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,140 $5,200 Implemented
MA0517 # 07 Y:2002 07 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,164 $2,500 Implemented
MA0517 # 08 Y:2002 08 2002 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $853 $1,515 Implemented
UD0619 # 01 Y:2001 01 2001 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $124,956 $0 Implemented