IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

31

matching recommendations
Reset
SIC 306 Fabricated Rubber Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0451 # 05 Y:2012 05 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,516 $4,075 Implemented
NC0451 # 03 Y:2012 03 2012 INSTALL OCCUPANCY SENSORS $252 $533 Implemented
NC0451 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $444 $1,674 Implemented
NC0451 # 01 Y:2012 01 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,790 $14,320 Implemented
NC0451 # 06 Y:2012 06 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $158 $100 Implemented
TN0605 # 03 Y:1997 03 1997 KEEP BOILER TUBES CLEAN $39,970 $70,960 Implemented
TN0605 # 04 Y:1997 04 1997 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $10,910 $1,330 Implemented
TN0605 # 02 Y:1997 02 1997 REDUCE SCRAP PRODUCTION $100,760 $25,700 Implemented
TN0605 # 01 Y:1997 01 1997 INSTALL EQUIPMENT TO MOVE PRODUCT $104,110 $129,700 Implemented
NC0084 # 02 Y:1996 02 1996 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,441 $3,000 Implemented
NC0084 # 12 Y:1996 12 1996 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $25,015 $18,000 Implemented
NC0084 # 11 Y:1996 11 1996 USE DEMAND CONTROLLER OR LOAD SHEDDER $1,960 $2,000 Implemented
NC0084 # 09 Y:1996 09 1996 INSULATE BARE EQUIPMENT $932 $549 Implemented
NC0084 # 08 Y:1996 08 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,827 $2,970 Implemented
NC0084 # 04 Y:1996 04 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,498 $1,700 Implemented
NC0084 # 03 Y:1996 03 1996 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $9,833 $400 Implemented
NC0084 # 01 Y:1996 01 1996 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $20,895 $10,000 Implemented
NC0069 # 01 Y:1995 01 1995 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $21,000 $45,000 Implemented
NC0069 # 02 Y:1995 02 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $388 $300 Implemented
NC0069 # 04 Y:1995 04 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $192 $168 Implemented
NC0069 # 08 Y:1995 08 1995 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $6,888 $7,500 Implemented
AT0088 # 02 Y:1987 02 1987 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $366 $307 Implemented
AT0088 # 03 Y:1987 03 1987 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $802 $1,500 Implemented
AT0088 # 04 Y:1987 04 1987 INSULATE BARE EQUIPMENT $854 $800 Implemented
AT0088 # 05 Y:1987 05 1987 AIR CONDITION ONLY SPACE NECESSARY $1,720 $5,000 Implemented