IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

111

matching recommendations
Reset
SIC 306 Fabricated Rubber Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0853 # 02 Y:2008 02 2008 UTILIZE A LESS EXPENSIVE COOLING METHOD $1,512 $0 Not Implemented
GT0853 # 01 Y:2008 01 2008 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $6,045 $0 Implemented
GT0853 # 05 Y:2008 05 2008 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $73,789 $34,472 Not Implemented
GT0853 # 06 Y:2008 06 2008 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $46,634 $55,500 Not Implemented
GT0853 # 07 Y:2008 07 2008 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $10,989 $8,200 Not Implemented
GT0718 # 01 Y:2001 01 2001 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $14,000 $0 n/a
GT0718 # 09 Y:2001 09 2001 COMBINE UTILITY METERS $127 $0 n/a
GT0718 # 07 Y:2001 07 2001 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $12,400 $30,000 n/a
GT0718 # 06 Y:2001 06 2001 INSTALL EQUIPMENT TO MOVE PRODUCT $99,000 $80,000 n/a
GT0718 # 05 Y:2001 05 2001 LIMIT AND CONTROL SECONDARY COMBUSTION AIR IN FURNACE $35,705 $3,500 n/a
GT0718 # 04 Y:2001 04 2001 UPGRADE CONTROLS ON COMPRESSORS $1,625 $7,000 n/a
GT0718 # 03 Y:2001 03 2001 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $645 $0 n/a
GT0718 # 02 Y:2001 02 2001 COMBINE UTILITY METERS $2,360 $0 n/a
GT0718 # 08 Y:2001 08 2001 USE WATER-BASED ADHESIVES $73,300 $20,000 n/a
GT0701 # 03 Y:2000 03 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,842 $9,456 Not Implemented
GT0701 # 05 Y:2000 05 2000 RECOVER AND REUSE WASTE MATERIAL $2,219 $0 Implemented
GT0701 # 06 Y:2000 06 2000 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $30,845 $0 Implemented
GT0701 # 07 Y:2000 07 2000 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $36,500 $28,000 Not Implemented
GT0701 # 01 Y:2000 01 2000 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $11,490 $5,000 Not Implemented
GT0701 # 02 Y:2000 02 2000 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $23,600 $2,200 Not Implemented
GT0701 # 04 Y:2000 04 2000 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,420 $25,117 Implemented
GT0701 # 08 Y:2000 08 2000 INSULATE BARE EQUIPMENT $1,234 $2,999 Not Implemented
GT0664 # 01 Y:1999 01 1999 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $31,943 $0 Not Implemented
GT0664 # 07 Y:1999 07 1999 INSTALL FOSSIL FUEL MAKE-UP AIR UNIT $2,110 $5,500 Not Implemented
GT0664 # 06 Y:1999 06 1999 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,985 $660 Implemented