Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
118
matching recommendationsSIC | 306 | Fabricated Rubber Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
GT0865 # 08 Y:2009 | 08 | 2009 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $69,163 | $135,000 | Not Implemented |
GT0865 # 07 Y:2009 | 07 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,256 | $15,290 | Implemented |
GT0853 # 02 Y:2008 | 02 | 2008 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $1,512 | $0 | Not Implemented |
GT0853 # 10 Y:2008 | 10 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $128,543 | $230,470 | Implemented |
GT0853 # 09 Y:2008 | 09 | 2008 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $148,679 | $40,000 | Not Implemented |
GT0853 # 08 Y:2008 | 08 | 2008 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $1,629 | $2,450 | Implemented |
GT0853 # 07 Y:2008 | 07 | 2008 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $10,989 | $8,200 | Not Implemented |
GT0853 # 06 Y:2008 | 06 | 2008 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $46,634 | $55,500 | Not Implemented |
GT0853 # 05 Y:2008 | 05 | 2008 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $73,789 | $34,472 | Not Implemented |
GT0853 # 04 Y:2008 | 04 | 2008 | RESCHEDULE AND REARRANGE MULTIPLE-SOURCE HEATING SYSTEMS | $7,123 | $3,000 | Implemented |
GT0853 # 03 Y:2008 | 03 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $27,999 | $4,500 | Implemented |
GT0853 # 01 Y:2008 | 01 | 2008 | USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS | $6,045 | $0 | Implemented |
GT0718 # 09 Y:2001 | 09 | 2001 | COMBINE UTILITY METERS | $127 | $0 | n/a |
GT0718 # 08 Y:2001 | 08 | 2001 | USE WATER-BASED ADHESIVES | $73,300 | $20,000 | n/a |
GT0718 # 07 Y:2001 | 07 | 2001 | USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR | $12,400 | $30,000 | n/a |
GT0718 # 05 Y:2001 | 05 | 2001 | LIMIT AND CONTROL SECONDARY COMBUSTION AIR IN FURNACE | $35,705 | $3,500 | n/a |
GT0718 # 06 Y:2001 | 06 | 2001 | INSTALL EQUIPMENT TO MOVE PRODUCT | $99,000 | $80,000 | n/a |
GT0718 # 04 Y:2001 | 04 | 2001 | UPGRADE CONTROLS ON COMPRESSORS | $1,625 | $7,000 | n/a |
GT0718 # 03 Y:2001 | 03 | 2001 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $645 | $0 | n/a |
GT0718 # 02 Y:2001 | 02 | 2001 | COMBINE UTILITY METERS | $2,360 | $0 | n/a |
GT0718 # 01 Y:2001 | 01 | 2001 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $14,000 | $0 | n/a |
GT0701 # 06 Y:2000 | 06 | 2000 | LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER | $30,845 | $0 | Implemented |
GT0701 # 04 Y:2000 | 04 | 2000 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $3,420 | $25,117 | Implemented |
GT0701 # 08 Y:2000 | 08 | 2000 | INSULATE BARE EQUIPMENT | $1,234 | $2,999 | Not Implemented |
GT0701 # 07 Y:2000 | 07 | 2000 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $36,500 | $28,000 | Not Implemented |