Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,116
matching recommendationsSIC | 306 | Fabricated Rubber Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SD0234 # 01 Y:1999 | 01 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $19,609 | $25,688 | Not Implemented |
SD0234 # 02 Y:1999 | 02 | 1999 | INSTALL SPECTRAL REFLECTORS / DELAMP | $26,750 | $21,265 | Not Implemented |
SD0234 # 03 Y:1999 | 03 | 1999 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $6,768 | $13,000 | Not Implemented |
SD0234 # 04 Y:1999 | 04 | 1999 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,069 | $1,425 | Implemented |
SD0234 # 05 Y:1999 | 05 | 1999 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,471 | $7,825 | Not Implemented |
SD0234 # 06 Y:1999 | 06 | 1999 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $3,739 | $3,334 | Not Implemented |
SD0234 # 07 Y:1999 | 07 | 1999 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $151 | $0 | Not Implemented |
SD0234 # 08 Y:1999 | 08 | 1999 | REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS | $8,640 | $510 | Not Implemented |
SD0234 # 09 Y:1999 | 09 | 1999 | INSTALL EQUIPMENT TO MOVE PRODUCT | $119,957 | $150,000 | Not Implemented |
GT0664 # 01 Y:1999 | 01 | 1999 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $31,943 | $0 | Not Implemented |
GT0664 # 02 Y:1999 | 02 | 1999 | INSULATE BARE EQUIPMENT | $13,210 | $19,500 | Implemented |
GT0664 # 03 Y:1999 | 03 | 1999 | METER WASTE WATER | $408 | $450 | Not Implemented |
GT0664 # 04 Y:1999 | 04 | 1999 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $2,465 | $1,280 | Not Implemented |
GT0664 # 05 Y:1999 | 05 | 1999 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,487 | $890 | Not Implemented |
GT0664 # 06 Y:1999 | 06 | 1999 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $1,985 | $660 | Implemented |
GT0664 # 07 Y:1999 | 07 | 1999 | INSTALL FOSSIL FUEL MAKE-UP AIR UNIT | $2,110 | $5,500 | Not Implemented |
GT0664 # 08 Y:1999 | 08 | 1999 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $29,350 | $5,500 | Not Implemented |
GT0664 # 09 Y:1999 | 09 | 1999 | MINIMIZE WATER USAGE | $3,000 | $10,100 | Not Implemented |
MA0438 # 01 Y:1999 | 01 | 1999 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,011 | $6,075 | Not Implemented |
MA0438 # 02 Y:1999 | 02 | 1999 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,856 | $4,925 | Not Implemented |
MA0438 # 03 Y:1999 | 03 | 1999 | MODERATE COOLING TOWER OUTLET TEMPERATURE | $1,055 | $3,400 | Not Implemented |
MA0436 # 01 Y:1999 | 01 | 1999 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $35,895 | $41,600 | Not Implemented |
MA0436 # 02 Y:1999 | 02 | 1999 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $24,170 | $27,774 | Implemented |
MA0436 # 03 Y:1999 | 03 | 1999 | MODERATE COOLING TOWER OUTLET TEMPERATURE | $7,745 | $12,435 | Implemented |
MA0436 # 04 Y:1999 | 04 | 1999 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $15,831 | $44,552 | Not Implemented |