IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

204

matching recommendations
Reset
SIC 306 Fabricated Rubber Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0319 # 19 Y:2003 19 2003 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $2,166 $0 Implemented
SF0256 # 01 Y:2003 01 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,773 $636 Not Implemented
SF0256 # 02 Y:2003 02 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $593 $433 Not Implemented
SF0256 # 03 Y:2003 03 2003 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $11,197 $8,880 Not Implemented
SF0256 # 04 Y:2003 04 2003 INSTALL OCCUPANCY SENSORS $2,150 $5,160 Not Implemented
SF0256 # 05 Y:2003 05 2003 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $11,466 $7,440 Not Implemented
SF0256 # 06 Y:2003 06 2003 RECOVER WASTE HEAT FROM EQUIPMENT $382 $1,618 Not Implemented
SF0256 # 07 Y:2003 07 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $801 $5,231 Not Implemented
SF0256 # 08 Y:2003 08 2003 REUSE / RECYCLE/ SELL RUBBER PRODUCTS $975 $1,800 Not Implemented
SF0245 # 01 Y:2002 01 2002 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $7,917 $7,200 Not Implemented
SF0245 # 02 Y:2002 02 2002 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $3,065 $4,060 Not Implemented
SF0245 # 03 Y:2002 03 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,576 $4,115 Implemented
SF0245 # 04 Y:2002 04 2002 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $8,585 $20,725 Implemented
SF0245 # 05 Y:2002 05 2002 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $19,484 $97,649 Not Implemented
SF0245 # 06 Y:2002 06 2002 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $2,738 $6,972 Implemented
SF0245 # 07 Y:2002 07 2002 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,193 $0 Implemented
SF0245 # 08 Y:2002 08 2002 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $74,335 $160,000 Not Implemented
SF0245 # 09 Y:2002 09 2002 INSTALL AUTOMATIC PACKING EQUIPMENT $62,400 $250,000 Not Implemented
SD0301 # 01 Y:2002 01 2002 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $30,135 $58,000 Not Implemented
SD0301 # 02 Y:2002 02 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,968 $320 Not Implemented
SD0301 # 03 Y:2002 03 2002 INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS $3,733 $1,000 Not Implemented
SD0301 # 04 Y:2002 04 2002 INSTALL OCCUPANCY SENSORS $2,775 $6,000 Not Implemented
SD0301 # 05 Y:2002 05 2002 INSULATE BARE EQUIPMENT $2,690 $1,200 Not Implemented
SD0301 # 06 Y:2002 06 2002 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $1,586 $1,000 Not Implemented
SD0301 # 07 Y:2002 07 2002 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $1,584 $2,000 Not Implemented