Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
36
matching recommendationsSIC | 306 | Fabricated Rubber Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
BD0349 # 01 Y:2008 | 01 | 2008 | INSTALL OCCUPANCY SENSORS | $8,788 | $1,125 | Implemented |
BD0349 # 02 Y:2008 | 02 | 2008 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $38,551 | $96,150 | Not Implemented |
BD0349 # 03 Y:2008 | 03 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,618 | $0 | Not Implemented |
BD0349 # 04 Y:2008 | 04 | 2008 | REPLACE BOILER | $205,005 | $110,000 | Not Implemented |
BD0349 # 05 Y:2008 | 05 | 2008 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $87,545 | $10,000 | Not Implemented |
BD0349 # 06 Y:2008 | 06 | 2008 | INSTALL TURBULATORS | $131,143 | $8,000 | Not Implemented |
BD0349 # 07 Y:2008 | 07 | 2008 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $128,022 | $46,000 | Not Implemented |
BD0349 # 08 Y:2008 | 08 | 2008 | MINIMIZE WATER USAGE | $991 | $2,300 | Not Implemented |
IC0054 # 06 Y:2003 | 06 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,988 | $19,296 | Not Implemented |
IC0054 # 05 Y:2003 | 05 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $192 | $150 | Not Implemented |
IC0054 # 04 Y:2003 | 04 | 2003 | INSTALL OCCUPANCY SENSORS | $808 | $2,002 | Not Implemented |
IC0054 # 03 Y:2003 | 03 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,471 | $1,000 | Not Implemented |
IC0054 # 02 Y:2003 | 02 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,888 | $7,452 | Not Implemented |
IC0054 # 01 Y:2003 | 01 | 2003 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $358 | $1,074 | Implemented |
BD0142 # 02 Y:1999 | 02 | 1999 | INSTALL OCCUPANCY SENSORS | $325 | $675 | Implemented |
BD0142 # 06 Y:1999 | 06 | 1999 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $2,080 | $6,500 | Implemented |
BD0142 # 05 Y:1999 | 05 | 1999 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $1,238 | $3,500 | Not Implemented |
BD0142 # 04 Y:1999 | 04 | 1999 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $25,426 | $5,000 | Implemented |
BD0142 # 03 Y:1999 | 03 | 1999 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $141 | $0 | Implemented |
BD0142 # 01 Y:1999 | 01 | 1999 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,333 | $2,050 | Implemented |
WI0227 # 03 Y:1995 | 03 | 1995 | INSULATE BARE EQUIPMENT | $1,090 | $100 | Not Implemented |
WI0227 # 02 Y:1995 | 02 | 1995 | REDUCE VENTILATION AIR | $603 | $1,000 | Not Implemented |
WI0227 # 07 Y:1995 | 07 | 1995 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $1,300 | $0 | Not Implemented |
WI0227 # 05 Y:1995 | 05 | 1995 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $293 | $640 | Not Implemented |
WI0227 # 04 Y:1995 | 04 | 1995 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $578 | $0 | Not Implemented |