IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

36

matching recommendations
Reset
SIC 306 Fabricated Rubber Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0349 # 01 Y:2008 01 2008 INSTALL OCCUPANCY SENSORS $8,788 $1,125 Implemented
BD0349 # 02 Y:2008 02 2008 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $38,551 $96,150 Not Implemented
BD0349 # 03 Y:2008 03 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,618 $0 Not Implemented
BD0349 # 04 Y:2008 04 2008 REPLACE BOILER $205,005 $110,000 Not Implemented
BD0349 # 05 Y:2008 05 2008 DIRECT WARMEST AIR TO COMBUSTION INTAKE $87,545 $10,000 Not Implemented
BD0349 # 06 Y:2008 06 2008 INSTALL TURBULATORS $131,143 $8,000 Not Implemented
BD0349 # 07 Y:2008 07 2008 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $128,022 $46,000 Not Implemented
BD0349 # 08 Y:2008 08 2008 MINIMIZE WATER USAGE $991 $2,300 Not Implemented
IC0054 # 06 Y:2003 06 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,988 $19,296 Not Implemented
IC0054 # 05 Y:2003 05 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $192 $150 Not Implemented
IC0054 # 04 Y:2003 04 2003 INSTALL OCCUPANCY SENSORS $808 $2,002 Not Implemented
IC0054 # 03 Y:2003 03 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,471 $1,000 Not Implemented
IC0054 # 02 Y:2003 02 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,888 $7,452 Not Implemented
IC0054 # 01 Y:2003 01 2003 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $358 $1,074 Implemented
BD0142 # 02 Y:1999 02 1999 INSTALL OCCUPANCY SENSORS $325 $675 Implemented
BD0142 # 06 Y:1999 06 1999 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $2,080 $6,500 Implemented
BD0142 # 05 Y:1999 05 1999 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $1,238 $3,500 Not Implemented
BD0142 # 04 Y:1999 04 1999 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $25,426 $5,000 Implemented
BD0142 # 03 Y:1999 03 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $141 $0 Implemented
BD0142 # 01 Y:1999 01 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,333 $2,050 Implemented
WI0227 # 03 Y:1995 03 1995 INSULATE BARE EQUIPMENT $1,090 $100 Not Implemented
WI0227 # 02 Y:1995 02 1995 REDUCE VENTILATION AIR $603 $1,000 Not Implemented
WI0227 # 07 Y:1995 07 1995 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $1,300 $0 Not Implemented
WI0227 # 05 Y:1995 05 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $293 $640 Not Implemented
WI0227 # 04 Y:1995 04 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $578 $0 Not Implemented