IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

32

matching recommendations
Reset
SIC 306 Fabricated Rubber Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0853 # 03 Y:2023 03 2023 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $7,672 $30,500 Implemented
MA0853 # 05 Y:2023 05 2023 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $3,613 $59,377 Implemented
MA0853 # 06 Y:2023 06 2023 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $3,336 $24,300 Implemented
MA0853 # 01 Y:2023 01 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,202 $18,988 Implemented
MA0768 # 04 Y:2016 04 2016 MINIMIZE WATER USAGE $587 $3,650 Implemented
MA0768 # 03 Y:2016 03 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $871 $1,000 Implemented
MA0768 # 02 Y:2016 02 2016 INSTALL / REPAIR INSULATION ON STEAM LINES $939 $3,914 Implemented
MA0768 # 06 Y:2016 06 2016 CLOSE OFF UNNEEDED STEAM LINES $376 $4,348 Implemented
MA0768 # 08 Y:2016 08 2016 INSTALL / REPAIR INSULATION ON STEAM LINES $313 $1,944 Implemented
MA0450 # 05 Y:1999 05 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,423 $5,216 Implemented
MA0450 # 03 Y:1999 03 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $4,892 $5,813 Implemented
MA0450 # 02 Y:1999 02 1999 INSTALL OCCUPANCY SENSORS $1,042 $1,000 Implemented
MA0450 # 06 Y:1999 06 1999 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $537 $0 Implemented
MA0447 # 02 Y:1999 02 1999 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,131 $4,925 Implemented
MA0447 # 05 Y:1999 05 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $591 $120 Implemented
MA0447 # 07 Y:1999 07 1999 INSTALL TIMERS AND/OR THERMOSTATS $473 $748 Implemented
MA0328 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,528 $44,433 Implemented
MA0328 # 04 Y:1995 04 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,889 $540 Implemented
MA0328 # 05 Y:1995 05 1995 USE PHOTOCELL CONTROLS $1,851 $286 Implemented
MA0328 # 07 Y:1995 07 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $985 $1,440 Implemented
MA0328 # 08 Y:1995 08 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $477 $0 Implemented
MA0328 # 13 Y:1995 13 1995 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $1,755 $16,400 Implemented
MA0188 # 06 Y:1990 06 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $785 $2,400 Implemented
MA0188 # 08 Y:1990 08 1990 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $215 $545 Implemented
MA0188 # 05 Y:1990 05 1990 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,378 $245 Implemented