IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

30

matching recommendations
Reset
SIC 306 Fabricated Rubber Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0685 # 01 Y:2004 01 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $265,308 $559,374 Implemented
OK0685 # 04 Y:2004 04 2004 INSULATE BARE EQUIPMENT $9,972 $3,312 Implemented
OK0685 # 03 Y:2004 03 2004 INSULATE BARE EQUIPMENT $23,175 $1,573 Implemented
OK0685 # 06 Y:2004 06 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $6,053 $2,023 Implemented
OK0685 # 02 Y:2004 02 2004 PREHEAT COMBUSTION AIR WITH WASTE HEAT $10,694 $34,154 Implemented
OK0658 # 09 Y:2003 09 2003 INSTALL OCCUPANCY SENSORS $6,270 $2,004 Implemented
OK0658 # 08 Y:2003 08 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,609 $30,876 Implemented
OK0658 # 05 Y:2003 05 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,150 $5,273 Implemented
OK0658 # 04 Y:2003 04 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,978 $367 Implemented
OK0658 # 03 Y:2003 03 2003 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $11,031 $0 Implemented
OK0658 # 01 Y:2003 01 2003 UPGRADE CONTROLS ON COMPRESSORS $51,704 $45,000 Implemented
OK0539 # 07 Y:1998 07 1998 $69,300 $0 Implemented
OK0539 # 02 Y:1998 02 1998 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $9,052 $15,600 Implemented
OK0305 # 01 Y:1990 01 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $658 $236 Implemented
OK0305 # 02 Y:1990 02 1990 INSULATE BARE EQUIPMENT $1,153 $836 Implemented
OK0305 # 05 Y:1990 05 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,686 $2,782 Implemented
OK0302 # 01 Y:1989 01 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $484 $167 Implemented
OK0302 # 03 Y:1989 03 1989 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $134 $280 Implemented
OK0302 # 05 Y:1989 05 1989 INSTALL TIMERS AND/OR THERMOSTATS $373 $630 Implemented
OK0168 # 09 Y:1985 09 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,999 $1,400 Implemented
OK0168 # 07 Y:1985 07 1985 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $595 $760 Implemented
OK0168 # 06 Y:1985 06 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $236 $126 Implemented
OK0168 # 05 Y:1985 05 1985 RECOVER WASTE HEAT FROM EQUIPMENT $358 $468 Implemented
OK0168 # 04 Y:1985 04 1985 REPAIR AND ELIMINATE STEAM LEAKS $9,402 $350 Implemented
OK0168 # 03 Y:1985 03 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $831 $140 Implemented