Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
46
matching recommendationsSIC | 306 | Fabricated Rubber Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IA0277 # 09 Y:2001 | 09 | 2001 | REPAIR AND ELIMINATE STEAM LEAKS | $2,357 | $2,400 | Implemented |
IA0277 # 08 Y:2001 | 08 | 2001 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,004 | $5,000 | Implemented |
IA0277 # 07 Y:2001 | 07 | 2001 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $9,556 | $0 | Not Implemented |
IA0277 # 06 Y:2001 | 06 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,422 | $40 | Not Implemented |
IA0277 # 05 Y:2001 | 05 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,554 | $580 | Not Implemented |
IA0277 # 04 Y:2001 | 04 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,705 | $761 | Implemented |
IA0277 # 03 Y:2001 | 03 | 2001 | INSTALL OCCUPANCY SENSORS | $2,257 | $3,259 | Not Implemented |
IA0277 # 02 Y:2001 | 02 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,129 | $0 | Implemented |
IA0277 # 01 Y:2001 | 01 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,148 | $36,193 | Not Implemented |
IA0277 # 10 Y:2001 | 10 | 2001 | INSTALL EQUIPMENT TO MOVE PRODUCT | $234,364 | $136,500 | n/a |
LM0019 # 01 Y:2001 | 01 | 2001 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $425 | $418 | Not Implemented |
LM0019 # 02 Y:2001 | 02 | 2001 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $12,586 | $240 | Not Implemented |
LM0019 # 03 Y:2001 | 03 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,085 | $2,482 | Not Implemented |
LM0019 # 04 Y:2001 | 04 | 2001 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $3,087 | $450 | Implemented |
LM0019 # 05 Y:2001 | 05 | 2001 | OPTIMIZE LOT SIZES TO REDUCE INVENTORY CARRYING COSTS | $10,000 | $3,000 | Implemented |
GT0718 # 02 Y:2001 | 02 | 2001 | COMBINE UTILITY METERS | $2,360 | $0 | n/a |
UD0629 # 01 Y:2001 | 01 | 2001 | MOVE PRODUCT USING MECHANICAL MEANS | $21,879 | $25,000 | Not Implemented |
GT0718 # 09 Y:2001 | 09 | 2001 | COMBINE UTILITY METERS | $127 | $0 | n/a |
GT0718 # 08 Y:2001 | 08 | 2001 | USE WATER-BASED ADHESIVES | $73,300 | $20,000 | n/a |
GT0718 # 07 Y:2001 | 07 | 2001 | USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR | $12,400 | $30,000 | n/a |
GT0718 # 06 Y:2001 | 06 | 2001 | INSTALL EQUIPMENT TO MOVE PRODUCT | $99,000 | $80,000 | n/a |
GT0718 # 05 Y:2001 | 05 | 2001 | LIMIT AND CONTROL SECONDARY COMBUSTION AIR IN FURNACE | $35,705 | $3,500 | n/a |
GT0718 # 04 Y:2001 | 04 | 2001 | UPGRADE CONTROLS ON COMPRESSORS | $1,625 | $7,000 | n/a |
GT0718 # 03 Y:2001 | 03 | 2001 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $645 | $0 | n/a |
GT0718 # 01 Y:2001 | 01 | 2001 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $14,000 | $0 | n/a |