IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

42

matching recommendations
Reset
SIC 306 Fabricated Rubber Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0015 # 03 Y:2007 03 2007 REPAIR OR REPLACE STEAM TRAPS $2,000 $1,600 Implemented
TT0015 # 05 Y:2007 05 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,011 $16,913 Not Implemented
TT0015 # 04 Y:2007 04 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $33,236 $99,598 Not Implemented
TT0015 # 02 Y:2007 02 2007 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $17,800 $35,600 Not Implemented
TT0015 # 01 Y:2007 01 2007 OPTIMIZE PLANT POWER FACTOR $8,343 $10,000 Not Implemented
MI0158 # 02 Y:2007 02 2007 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $55,437 $101,347 Implemented
MI0158 # 10 Y:2007 10 2007 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,886 $2,000 Implemented
MI0158 # 09 Y:2007 09 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,073 $40 Implemented
MI0158 # 08 Y:2007 08 2007 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $9,282 $3,475 Not Implemented
MI0158 # 07 Y:2007 07 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,478 $5,967 Not Implemented
MI0158 # 06 Y:2007 06 2007 REPAIR OR REPLACE STEAM TRAPS $13,330 $1,700 Implemented
MI0158 # 05 Y:2007 05 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $14,507 $1,210 Implemented
MI0158 # 04 Y:2007 04 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,963 $20,900 Implemented
MI0158 # 03 Y:2007 03 2007 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $21,358 $46,238 Not Implemented
MI0158 # 01 Y:2007 01 2007 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $92,023 $8,580 Implemented
TT0012 # 07 Y:2007 07 2007 INSULATE BARE EQUIPMENT $45,660 $28,527 Not Implemented
TT0012 # 04 Y:2007 04 2007 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $31,671 $79,800 Not Implemented
TT0012 # 05 Y:2007 05 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $343 $868 Implemented
TT0012 # 06 Y:2007 06 2007 $648 $1,275 Not Implemented
TT0012 # 03 Y:2007 03 2007 Leaks and Insulation $9,860 $1,491 Implemented
TT0012 # 02 Y:2007 02 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,237 $200 Implemented
TT0012 # 01 Y:2007 01 2007 REPAIR AND ELIMINATE STEAM LEAKS $331 $600 Implemented
TT0012 # 08 Y:2007 08 2007 $2,490 $1,019 Not Implemented
UF0401 # 01 Y:2007 01 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,913 $36,935 Not Implemented
UF0401 # 10 Y:2007 10 2007 INSTALL EQUIPMENT TO MOVE PRODUCT $8,845 $43,500 Not Implemented