IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

515

matching recommendations
Reset
SIC 3061 Mechanical Rubber Goods
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0438 # 03 Y:1999 03 1999 MODERATE COOLING TOWER OUTLET TEMPERATURE $1,055 $3,400 Not Implemented
MA0436 # 01 Y:1999 01 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $35,895 $41,600 Not Implemented
MA0436 # 02 Y:1999 02 1999 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $24,170 $27,774 Implemented
MA0436 # 03 Y:1999 03 1999 MODERATE COOLING TOWER OUTLET TEMPERATURE $7,745 $12,435 Implemented
MA0436 # 04 Y:1999 04 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $15,831 $44,552 Not Implemented
MA0436 # 05 Y:1999 05 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $16,698 $75,790 Not Implemented
MA0436 # 06 Y:1999 06 1999 INSTALL OCCUPANCY SENSORS $148 $77 Implemented
MA0436 # 07 Y:1999 07 1999 DISCONNECT BALLASTS $60 $100 Implemented
OK0539 # 01 Y:1998 01 1998 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $33,669 $117,000 Not Implemented
OK0539 # 02 Y:1998 02 1998 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $9,052 $15,600 Implemented
OK0539 # 03 Y:1998 03 1998 PREHEAT COMBUSTION AIR WITH WASTE HEAT $1,678 $5,722 Not Implemented
OK0539 # 04 Y:1998 04 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $949 $90 Not Implemented
OK0539 # 05 Y:1998 05 1998 FILTER AND REUSE HYDRAULIC OIL $6,430 $18,790 Not Implemented
OK0539 # 06 Y:1998 06 1998 METER WASTE WATER $885 $0 Not Implemented
OK0539 # 07 Y:1998 07 1998 $69,300 $0 Implemented
OK0539 # 08 Y:1998 08 1998 $20,600 $14,000 Not Implemented
DS0097 # 01 Y:1997 01 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,061 $6,939 Implemented
DS0097 # 02 Y:1997 02 1997 INSTALL OCCUPANCY SENSORS $509 $300 Implemented
DS0097 # 03 Y:1997 03 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $529 $172 Implemented
DS0097 # 04 Y:1997 04 1997 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $18,685 $32,775 Not Implemented
DS0097 # 05 Y:1997 05 1997 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $10,747 $27,600 Not Implemented
DS0097 # 06 Y:1997 06 1997 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $717 $15,900 Not Implemented
DS0097 # 07 Y:1997 07 1997 FILTER AND REUSE HYDRAULIC OIL $1,905 $0 Implemented
DS0097 # 08 Y:1997 08 1997 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $39,621 $9,000 Implemented
HO0145 # 01 Y:1997 01 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,073 $6,276 Not Implemented