IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

738

matching recommendations
Reset
SIC 3069 Fabricated Rubber Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MO0179 # 05 Y:1996 05 1996 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,057 $0 Implemented
MO0179 # 06 Y:1996 06 1996 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,587 $50 Implemented
MO0179 # 07 Y:1996 07 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,341 $263 Implemented
MO0179 # 10 Y:1996 10 1996 USE PLASTIC PALLETS INSTEAD OF WOOD $7,000 $20,000 Implemented
WI0265 # 01 Y:1996 01 1996 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $35,546 $60,000 Implemented
WI0265 # 05 Y:1996 05 1996 USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS $3,490 $6,500 Implemented
WI0265 # 06 Y:1996 06 1996 INSTALL TIMERS AND/OR THERMOSTATS $2,039 $6,400 Implemented
OK0494 # 03 Y:1996 03 1996 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $12,077 $3,040 Implemented
OK0494 # 04 Y:1996 04 1996 REPAIR AND ELIMINATE STEAM LEAKS $5,851 $3,600 Implemented
OK0494 # 05 Y:1996 05 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $689 $30 Implemented
OK0494 # 06 Y:1996 06 1996 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $469 $1,000 Implemented
UM0047 # 02 Y:1996 02 1996 OPTIMIZE PLANT POWER FACTOR $2,253 $4,880 Implemented
UM0047 # 04 Y:1996 04 1996 USE SYNTHETIC LUBRICANT $471 $256 Implemented
AM0266 # 01 Y:1996 01 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,370 $400 Implemented
AM0266 # 02 Y:1996 02 1996 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $390 $0 Implemented
AM0266 # 03 Y:1996 03 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $375 $185 Implemented
AM0266 # 04 Y:1996 04 1996 INSULATE BARE EQUIPMENT $360 $710 Implemented
AM0266 # 05 Y:1996 05 1996 ELIMINATE/REDUCE AN OPERATION $2,250 $6,600 Implemented
CO0350 # 01 Y:1995 01 1995 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $1,810 $0 Implemented
CO0350 # 02 Y:1995 02 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,580 $290 Implemented
CO0350 # 03 Y:1995 03 1995 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $1,300 $250 Implemented
NC0069 # 01 Y:1995 01 1995 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $21,000 $45,000 Implemented
NC0069 # 02 Y:1995 02 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $388 $300 Implemented
NC0069 # 04 Y:1995 04 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $192 $168 Implemented
NC0069 # 08 Y:1995 08 1995 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $6,888 $7,500 Implemented