IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,537

matching recommendations
Reset
SIC 3069 Fabricated Rubber Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0505 # 01 Y:2015 01 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,298 $6,690 Implemented
WV0505 # 02 Y:2015 02 2015 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $10,729 $22,950 Not Implemented
WV0505 # 03 Y:2015 03 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,348 $8,583 Implemented
WV0505 # 04 Y:2015 04 2015 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $7,847 $1,000 Implemented
WV0505 # 05 Y:2015 05 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,847 $345 Implemented
WV0505 # 06 Y:2015 06 2015 INSULATE BARE EQUIPMENT $4,707 $1,730 Not Implemented
WV0505 # 07 Y:2015 07 2015 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,601 $1,700 Implemented
WV0505 # 08 Y:2015 08 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,549 $0 Not Implemented
WV0505 # 09 Y:2015 09 2015 INSTALL SET-BACK TIMERS $2,219 $1,175 Not Implemented
WV0505 # 10 Y:2015 10 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,063 $35 Implemented
WV0505 # 11 Y:2015 11 2015 DEVELOP A REPAIR/REPLACE POLICY $1,699 $672 Implemented
WV0505 # 12 Y:2015 12 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $786 $179 Not Implemented
AM0681 # 01 Y:2015 01 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,953 $11,375 Implemented
AM0681 # 02 Y:2015 02 2015 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $14,391 $5,000 Implemented
AM0681 # 03 Y:2015 03 2015 INSTALL TIMERS AND/OR THERMOSTATS $2,120 $1,125 Implemented
AM0681 # 04 Y:2015 04 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $853 $430 Not Implemented
AM0681 # 05 Y:2015 05 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $741 $1,240 Implemented
AM0681 # 06 Y:2015 06 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $364 $182 Implemented
SD0497 # 01 Y:2015 01 2015 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $118,874 $425,000 Not Implemented
SD0497 # 02 Y:2015 02 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $15,403 $14,111 Not Implemented
SD0497 # 03 Y:2015 03 2015 INSTALL TIMERS AND/OR THERMOSTATS $15,039 $2,275 Not Implemented
SD0497 # 04 Y:2015 04 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,837 $1,500 Not Implemented
SD0497 # 05 Y:2015 05 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,591 $14,085 Not Implemented
SD0497 # 06 Y:2015 06 2015 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $7,238 $10,050 Not Implemented
SD0497 # 07 Y:2015 07 2015 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $6,323 $1,580 Not Implemented