IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

207

matching recommendations
Reset
SIC 3069 Fabricated Rubber Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0532 # 11 Y:2016 11 2016 INSTALL OCCUPANCY SENSORS $796 $795 Implemented
WV0532 # 12 Y:2016 12 2016 UPGRADE CONTROLS ON COMPRESSORS $530 $2,500 Not Implemented
WV0532 # 13 Y:2016 13 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $145 $25 Implemented
UD0943 # 08 Y:2016 08 2016 DEVELOP A REPAIR/REPLACE POLICY $411 $2,031 Not Implemented
UD0943 # 09 Y:2016 09 2016 CONTRACT A WOOD PALLET RECYCLING COMPANY $12,350 $0 Not Implemented
UD0943 # 07 Y:2016 07 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,294 $4,525 Not Implemented
UD0943 # 06 Y:2016 06 2016 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $24,866 $81,180 Not Implemented
UD0943 # 05 Y:2016 05 2016 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $196 $800 Not Implemented
UD0943 # 04 Y:2016 04 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $620 $0 Implemented
UD0943 # 02 Y:2016 02 2016 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $26,548 $2,400 Implemented
UD0943 # 01 Y:2016 01 2016 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $32,216 $700 Not Implemented
UD0943 # 03 Y:2016 03 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,300 $0 Implemented
WV0505 # 03 Y:2015 03 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,348 $8,583 Implemented
WV0505 # 02 Y:2015 02 2015 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $10,729 $22,950 Not Implemented
WV0505 # 01 Y:2015 01 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,298 $6,690 Implemented
WV0505 # 04 Y:2015 04 2015 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $7,847 $1,000 Implemented
WV0505 # 05 Y:2015 05 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,847 $345 Implemented
WV0505 # 06 Y:2015 06 2015 INSULATE BARE EQUIPMENT $4,707 $1,730 Not Implemented
WV0505 # 10 Y:2015 10 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,063 $35 Implemented
WV0505 # 11 Y:2015 11 2015 DEVELOP A REPAIR/REPLACE POLICY $1,699 $672 Implemented
WV0505 # 12 Y:2015 12 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $786 $179 Not Implemented
WV0505 # 09 Y:2015 09 2015 INSTALL SET-BACK TIMERS $2,219 $1,175 Not Implemented
WV0505 # 08 Y:2015 08 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,549 $0 Not Implemented
WV0505 # 07 Y:2015 07 2015 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,601 $1,700 Implemented
WV0491 # 08 Y:2014 08 2014 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $541 $235 Implemented