IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

46

matching recommendations
Reset
SIC 3069 Fabricated Rubber Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0140 # 09 Y:2014 09 2014 DISCONNECT BALLASTS $358 $50 Implemented
TT0140 # 08 Y:2014 08 2014 TURN OFF EQUIPMENT WHEN NOT IN USE $3,333 $50 Implemented
TT0140 # 07 Y:2014 07 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,206 $125 Implemented
TT0140 # 06 Y:2014 06 2014 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,930 $825 Not Implemented
TT0140 # 05 Y:2014 05 2014 OPTIMIZE PLANT POWER FACTOR $25,238 $36,000 Implemented
TT0140 # 04 Y:2014 04 2014 PREHEAT COMBUSTION AIR WITH WASTE HEAT $2,430 $4,000 Not Implemented
TT0140 # 03 Y:2014 03 2014 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $4,428 $8,000 Not Implemented
TT0140 # 02 Y:2014 02 2014 INSTALL / REPAIR INSULATION ON STEAM LINES $1,068 $1,545 Implemented
TT0140 # 01 Y:2014 01 2014 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $3,000 $2,000 Implemented
TT0015 # 04 Y:2007 04 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $33,236 $99,598 Not Implemented
TT0015 # 01 Y:2007 01 2007 OPTIMIZE PLANT POWER FACTOR $8,343 $10,000 Not Implemented
TT0015 # 02 Y:2007 02 2007 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $17,800 $35,600 Not Implemented
TT0015 # 03 Y:2007 03 2007 REPAIR OR REPLACE STEAM TRAPS $2,000 $1,600 Implemented
TT0015 # 05 Y:2007 05 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,011 $16,913 Not Implemented
TN0516 # 01 Y:1994 01 1994 TURN OFF EQUIPMENT WHEN NOT IN USE $81,008 $114,200 Implemented
TN0516 # 09 Y:1994 09 1994 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $161 $345 Not Implemented
TN0516 # 08 Y:1994 08 1994 INSULATE BARE EQUIPMENT $601 $430 Implemented
TN0516 # 07 Y:1994 07 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $952 $796 Implemented
TN0516 # 06 Y:1994 06 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,597 $460 Implemented
TN0516 # 05 Y:1994 05 1994 TURN OFF EQUIPMENT WHEN NOT IN USE $2,022 $3,735 Implemented
TN0516 # 04 Y:1994 04 1994 INSULATE BARE EQUIPMENT $14,244 $2,200 Implemented
TN0516 # 03 Y:1994 03 1994 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $12,822 $26,900 Implemented
TN0516 # 02 Y:1994 02 1994 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $24,983 $1,750 Implemented
TN0321 # 12 Y:1987 12 1987 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $466 $0 Implemented
TN0321 # 01 Y:1987 01 1987 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $9,567 $3,500 Implemented