IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

46

matching recommendations
Reset
SIC 3069 Fabricated Rubber Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0277 # 09 Y:2001 09 2001 REPAIR AND ELIMINATE STEAM LEAKS $2,357 $2,400 Implemented
IA0277 # 08 Y:2001 08 2001 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,004 $5,000 Implemented
IA0277 # 07 Y:2001 07 2001 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $9,556 $0 Not Implemented
IA0277 # 06 Y:2001 06 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,422 $40 Not Implemented
IA0277 # 05 Y:2001 05 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,554 $580 Not Implemented
IA0277 # 04 Y:2001 04 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,705 $761 Implemented
IA0277 # 03 Y:2001 03 2001 INSTALL OCCUPANCY SENSORS $2,257 $3,259 Not Implemented
IA0277 # 02 Y:2001 02 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,129 $0 Implemented
IA0277 # 01 Y:2001 01 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,148 $36,193 Not Implemented
IA0277 # 10 Y:2001 10 2001 INSTALL EQUIPMENT TO MOVE PRODUCT $234,364 $136,500 n/a
LM0019 # 01 Y:2001 01 2001 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $425 $418 Not Implemented
LM0019 # 02 Y:2001 02 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $12,586 $240 Not Implemented
LM0019 # 03 Y:2001 03 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,085 $2,482 Not Implemented
LM0019 # 04 Y:2001 04 2001 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $3,087 $450 Implemented
LM0019 # 05 Y:2001 05 2001 OPTIMIZE LOT SIZES TO REDUCE INVENTORY CARRYING COSTS $10,000 $3,000 Implemented
UD0629 # 02 Y:2001 02 2001 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $18,079 $15,000 n/a
GT0718 # 02 Y:2001 02 2001 COMBINE UTILITY METERS $2,360 $0 n/a
UD0629 # 03 Y:2001 03 2001 REDUCE SCRAP PRODUCTION $15,862 $6,000 Not Implemented
UD0629 # 04 Y:2001 04 2001 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $6,324 $0 Not Implemented
UD0629 # 05 Y:2001 05 2001 INSULATE BARE EQUIPMENT $5,835 $1,760 Not Implemented
UD0629 # 06 Y:2001 06 2001 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $5,200 $1,500 Not Implemented
UD0629 # 07 Y:2001 07 2001 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $3,907 $0 Implemented
UD0629 # 08 Y:2001 08 2001 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,128 $0 Not Implemented
UD0629 # 09 Y:2001 09 2001 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $982 $250 Not Implemented
UD0629 # 10 Y:2001 10 2001 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $628 $300 Not Implemented