Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
46
matching recommendationsSIC | 3069 | Fabricated Rubber Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IA0277 # 09 Y:2001 | 09 | 2001 | REPAIR AND ELIMINATE STEAM LEAKS | $2,357 | $2,400 | Implemented |
IA0277 # 08 Y:2001 | 08 | 2001 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,004 | $5,000 | Implemented |
IA0277 # 07 Y:2001 | 07 | 2001 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $9,556 | $0 | Not Implemented |
IA0277 # 06 Y:2001 | 06 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,422 | $40 | Not Implemented |
IA0277 # 05 Y:2001 | 05 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,554 | $580 | Not Implemented |
IA0277 # 04 Y:2001 | 04 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,705 | $761 | Implemented |
IA0277 # 03 Y:2001 | 03 | 2001 | INSTALL OCCUPANCY SENSORS | $2,257 | $3,259 | Not Implemented |
IA0277 # 02 Y:2001 | 02 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,129 | $0 | Implemented |
IA0277 # 01 Y:2001 | 01 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,148 | $36,193 | Not Implemented |
IA0277 # 10 Y:2001 | 10 | 2001 | INSTALL EQUIPMENT TO MOVE PRODUCT | $234,364 | $136,500 | n/a |
LM0019 # 01 Y:2001 | 01 | 2001 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $425 | $418 | Not Implemented |
LM0019 # 02 Y:2001 | 02 | 2001 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $12,586 | $240 | Not Implemented |
LM0019 # 03 Y:2001 | 03 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,085 | $2,482 | Not Implemented |
LM0019 # 04 Y:2001 | 04 | 2001 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $3,087 | $450 | Implemented |
LM0019 # 05 Y:2001 | 05 | 2001 | OPTIMIZE LOT SIZES TO REDUCE INVENTORY CARRYING COSTS | $10,000 | $3,000 | Implemented |
UD0629 # 02 Y:2001 | 02 | 2001 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $18,079 | $15,000 | n/a |
GT0718 # 02 Y:2001 | 02 | 2001 | COMBINE UTILITY METERS | $2,360 | $0 | n/a |
UD0629 # 03 Y:2001 | 03 | 2001 | REDUCE SCRAP PRODUCTION | $15,862 | $6,000 | Not Implemented |
UD0629 # 04 Y:2001 | 04 | 2001 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $6,324 | $0 | Not Implemented |
UD0629 # 05 Y:2001 | 05 | 2001 | INSULATE BARE EQUIPMENT | $5,835 | $1,760 | Not Implemented |
UD0629 # 06 Y:2001 | 06 | 2001 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $5,200 | $1,500 | Not Implemented |
UD0629 # 07 Y:2001 | 07 | 2001 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $3,907 | $0 | Implemented |
UD0629 # 08 Y:2001 | 08 | 2001 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,128 | $0 | Not Implemented |
UD0629 # 09 Y:2001 | 09 | 2001 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $982 | $250 | Not Implemented |
UD0629 # 10 Y:2001 | 10 | 2001 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $628 | $300 | Not Implemented |