IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

83

matching recommendations
Reset
SIC 308 Miscellaneous Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0554 # 10 Y:2015 10 2015 DEVELOP A REPAIR/REPLACE POLICY $2,829 $4,258 Implemented
NC0554 # 04 Y:2015 04 2015 RECOVER WASTE HEAT FROM EQUIPMENT $8,465 $12,000 Implemented
NC0554 # 03 Y:2015 03 2015 RECOVER WASTE HEAT FROM EQUIPMENT $1,597 $4,400 Implemented
NC0554 # 01 Y:2015 01 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,085 $12,500 Implemented
NC0554 # 08 Y:2015 08 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $147 $150 Implemented
NC0554 # 06 Y:2015 06 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,384 $100 Implemented
TT0134 # 03 Y:2014 03 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $96,724 $822 Implemented
WV0482 # 07 Y:2014 07 2014 UPGRADE CONTROLS ON COMPRESSORS $17,822 $26,000 Implemented
WV0482 # 16 Y:2014 16 2014 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $507 $1,167 Implemented
WV0482 # 14 Y:2014 14 2014 DEVELOP A REPAIR/REPLACE POLICY $3,427 $708 Implemented
WV0482 # 13 Y:2014 13 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,804 $200 Implemented
WV0482 # 11 Y:2014 11 2014 INSTALL / REPAIR INSULATION ON STEAM LINES $6,903 $1,632 Implemented
WV0482 # 05 Y:2014 05 2014 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $35,144 $1,000 Implemented
WV0482 # 04 Y:2014 04 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $37,141 $51,865 Implemented
WV0482 # 02 Y:2014 02 2014 REPAIR OR REPLACE STEAM TRAPS $135,791 $7,100 Implemented
WV0482 # 08 Y:2014 08 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,536 $9,000 Implemented
WV0482 # 06 Y:2014 06 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $31,791 $38,441 Implemented
NC0501 # 02 Y:2013 02 2013 UPGRADE CONTROLS ON COMPRESSORS $35,397 $25,000 Implemented
NC0501 # 03 Y:2013 03 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,920 $100 Implemented
NC0501 # 04 Y:2013 04 2013 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $21,685 $33,000 Implemented
NC0501 # 06 Y:2013 06 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $667 $1,630 Implemented
NC0501 # 07 Y:2013 07 2013 METER WASTE WATER $3,326 $4,200 Implemented
NC0468 # 01 Y:2012 01 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,060 $800 Implemented
NC0468 # 02 Y:2012 02 2012 RECOVER WASTE HEAT FROM EQUIPMENT $17,026 $18,000 Implemented
NC0468 # 11 Y:2012 11 2012 INSTALL OCCUPANCY SENSORS $2,082 $2,100 Implemented