Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
423
matching recommendationsSIC | 308 | Miscellaneous Plastics Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0473 # 01 Y:2000 | 01 | 2000 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $28,890 | $140,000 | Implemented |
MA0473 # 02 Y:2000 | 02 | 2000 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $24,924 | $129,000 | Implemented |
MA0473 # 03 Y:2000 | 03 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,760 | $1,200 | Implemented |
MA0473 # 04 Y:2000 | 04 | 2000 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $5,180 | $0 | Implemented |
MA0473 # 05 Y:2000 | 05 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,269 | $350 | Implemented |
MA0473 # 06 Y:2000 | 06 | 2000 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,779 | $7,000 | Implemented |
MA0473 # 07 Y:2000 | 07 | 2000 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,770 | $100 | Not Implemented |
MA0473 # 08 Y:2000 | 08 | 2000 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,440 | $3,000 | Implemented |
MA0473 # 09 Y:2000 | 09 | 2000 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $936 | $5,000 | Not Implemented |
MA0473 # 10 Y:2000 | 10 | 2000 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $650 | $1,250 | Not Implemented |
HO0228 # 01 Y:2000 | 01 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,864 | $8,232 | Implemented |
HO0228 # 02 Y:2000 | 02 | 2000 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,158 | $0 | Implemented |
HO0228 # 03 Y:2000 | 03 | 2000 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $455 | $1,000 | Not Implemented |
HO0228 # 04 Y:2000 | 04 | 2000 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $538 | $15 | Implemented |
HO0228 # 05 Y:2000 | 05 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,054 | $200 | Implemented |
HO0228 # 06 Y:2000 | 06 | 2000 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,810 | $778 | Implemented |
HO0228 # 07 Y:2000 | 07 | 2000 | OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES | $9,360 | $5,000 | Implemented |
HO0228 # 08 Y:2000 | 08 | 2000 | INSTALL SHELVES / RACKS TO UTILIZE UNUSED SPACE | $9,360 | $25,000 | Not Implemented |
HO0228 # 09 Y:2000 | 09 | 2000 | IMPROVE SPACE COMFORT CONDITIONING | $2,880 | $2,340 | Implemented |
HO0228 # 10 Y:2000 | 10 | 2000 | PURCHASE MATERIAL FROM SUPPLIER IN CUSTOMIZED PACKAGING | $10,395 | $3,000 | Implemented |
HO0228 # 11 Y:2000 | 11 | 2000 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $68,250 | $300,000 | Implemented |
HO0228 # 12 Y:2000 | 12 | 2000 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $1,440 | $1,500 | Implemented |
HO0228 # 13 Y:2000 | 13 | 2000 | MOVE PRODUCT USING MECHANICAL MEANS | $6,240 | $2,500 | Not Implemented |
HO0228 # 14 Y:2000 | 14 | 2000 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $39,000 | $6,000 | Implemented |
HO0228 # 15 Y:2000 | 15 | 2000 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $3,456 | $6,500 | Not Implemented |