IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

576

matching recommendations
Reset
SIC 308 Miscellaneous Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0299 # 01 Y:1997 01 1997 INSTALL AUTOMATIC PACKING EQUIPMENT $36,166 $7,000 Not Implemented
WI0299 # 02 Y:1997 02 1997 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $18,337 $0 Not Implemented
WI0299 # 03 Y:1997 03 1997 DIRECT WASTE GASSES TO BOILER COMBUSTION AIR $16,400 $10,000 Implemented
WI0299 # 04 Y:1997 04 1997 PREHEAT COMBUSTION AIR WITH WASTE HEAT $15,359 $10,000 Not Implemented
WI0299 # 05 Y:1997 05 1997 INSTALL SYSTEM TO COLLECT SCRAP $8,748 $12,000 Implemented
WI0299 # 06 Y:1997 06 1997 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,439 $16,400 Not Implemented
WI0299 # 07 Y:1997 07 1997 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,424 $500 Implemented
WI0299 # 08 Y:1997 08 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $784 $740 Implemented
BD0074 # 01 Y:1996 01 1996 USE POWER DURING OFF-PEAK PERIODS $44,073 $2,850 Implemented
BD0074 # 02 Y:1996 02 1996 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $17,093 $0 Implemented
BD0074 # 03 Y:1996 03 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $11,783 $12,980 Implemented
BD0074 # 04 Y:1996 04 1996 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $5,328 $580 Implemented
BD0074 # 05 Y:1996 05 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,319 $5,805 Not Implemented
BD0074 # 06 Y:1996 06 1996 INSTALL OCCUPANCY SENSORS $2,522 $1,125 Implemented
BD0074 # 07 Y:1996 07 1996 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $915 $1,180 Not Implemented
BD0074 # 08 Y:1996 08 1996 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $863 $522 Implemented
BD0074 # 09 Y:1996 09 1996 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $519 $1,515 Not Implemented
BD0074 # 10 Y:1996 10 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $394 $391 Not Implemented
BD0074 # 11 Y:1996 11 1996 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $56,426 $1,500 Implemented
BD0074 # 12 Y:1996 12 1996 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $6,360 $6,750 Implemented
BD0074 # 13 Y:1996 13 1996 MINIMIZE WATER USAGE $1,210 $500 Implemented
WI0275 # 01 Y:1996 01 1996 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $6,083 $1,400 Not Implemented
WI0275 # 02 Y:1996 02 1996 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $4,633 $14,000 Not Implemented
WI0275 # 03 Y:1996 03 1996 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,271 $3,200 Not Implemented
WI0275 # 04 Y:1996 04 1996 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $588 $450 Not Implemented