Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
13,535
matching recommendationsSIC | 308 | Miscellaneous Plastics Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IC0326 # 04 Y:2025 | 04 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,819 | $678 | n/a |
IC0326 # 03 Y:2025 | 03 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,821 | $4,859 | n/a |
IC0326 # 02 Y:2025 | 02 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $440 | $0 | n/a |
IC0326 # 09 Y:2025 | 09 | 2025 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $941 | $0 | n/a |
MZ0373 # 08 Y:2025 | 08 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $38,188 | $16,280 | n/a |
MZ0373 # 01 Y:2025 | 01 | 2025 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,877 | $6,000 | n/a |
MZ0373 # 09 Y:2025 | 09 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $463 | $948 | n/a |
MZ0373 # 02 Y:2025 | 02 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,710 | $120 | n/a |
MZ0373 # 06 Y:2025 | 06 | 2025 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $155 | $0 | n/a |
MZ0373 # 07 Y:2025 | 07 | 2025 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $2,825 | $0 | n/a |
MZ0373 # 05 Y:2025 | 05 | 2025 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $16,241 | $120,000 | n/a |
MZ0373 # 03 Y:2025 | 03 | 2025 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $2,122 | $500 | n/a |
MZ0373 # 10 Y:2025 | 10 | 2025 | INSTALL OCCUPANCY SENSORS | $882 | $1,200 | n/a |
MZ0373 # 04 Y:2025 | 04 | 2025 | RECOVER WASTE HEAT FROM EQUIPMENT | $17,800 | $5,600 | n/a |
SU0568 # 05 Y:2025 | 05 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $665 | $428 | n/a |
SU0568 # 03 Y:2025 | 03 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $662 | $0 | n/a |
SU0568 # 06 Y:2025 | 06 | 2025 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $647 | $63 | n/a |
SU0568 # 09 Y:2025 | 09 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $702 | $1,754 | n/a |
SU0568 # 04 Y:2025 | 04 | 2025 | DISCONNECT BALLASTS | $543 | $0 | n/a |
SU0568 # 10 Y:2025 | 10 | 2025 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $67 | $383 | n/a |
SU0568 # 11 Y:2025 | 11 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $12,609 | $285,164 | n/a |
SU0568 # 02 Y:2025 | 02 | 2025 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $6,415 | $0 | n/a |
SU0568 # 07 Y:2025 | 07 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,960 | $8,397 | n/a |
SU0568 # 01 Y:2025 | 01 | 2025 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $22,712 | $50 | n/a |
SU0568 # 08 Y:2025 | 08 | 2025 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $965 | $1,882 | n/a |