IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

701

matching recommendations
Reset
SIC 308 Miscellaneous Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
HO0193 # 05 Y:1999 05 1999 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $825 $2,000 Implemented
HO0193 # 06 Y:1999 06 1999 $1,000 $300 Implemented
HO0193 # 07 Y:1999 07 1999 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $1,872 $3,500 Not Implemented
HO0193 # 08 Y:1999 08 1999 $2,000 $10,000 Not Implemented
HO0193 # 09 Y:1999 09 1999 $5,000 $3,000 Not Implemented
UM0132 # 07 Y:1999 07 1999 USE LOW VOC OR WATER BASED PAINT $5,439 $500 Implemented
UM0132 # 06 Y:1999 06 1999 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $13,503 $3,700 Implemented
UM0132 # 05 Y:1999 05 1999 RECOVER WASTE HEAT FROM EQUIPMENT $815 $990 Implemented
UM0132 # 04 Y:1999 04 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $349 $1,000 Implemented
UM0132 # 03 Y:1999 03 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $667 $300 Implemented
UM0132 # 02 Y:1999 02 1999 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $680 $700 Implemented
UM0132 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,280 $7,301 Implemented
UM0132 # 08 Y:1999 08 1999 $53,333 $1,548 Not Implemented
SD0212 # 01 Y:1999 01 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $896 $0 Not Implemented
SD0212 # 02 Y:1999 02 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $25,608 $16,000 Not Implemented
SD0212 # 03 Y:1999 03 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $51,749 $13,000 Not Implemented
SD0212 # 04 Y:1999 04 1999 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $10,696 $0 Implemented
SD0212 # 05 Y:1999 05 1999 INSTALL SPECTRAL REFLECTORS / DELAMP $2,440 $3,840 Implemented
SD0212 # 06 Y:1999 06 1999 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $990 $0 Not Implemented
SD0212 # 07 Y:1999 07 1999 INSTALL SET-BACK TIMERS $2,140 $1,000 Implemented
SD0212 # 08 Y:1999 08 1999 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $3,550 $8,500 Not Implemented
SD0212 # 09 Y:1999 09 1999 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES $1,166 $0 Implemented
SD0212 # 10 Y:1999 10 1999 $40,000 $0 Not Implemented
AS0243 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,432 $3,754 Not Implemented
AS0243 # 02 Y:1999 02 1999 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $3,379 $225 Not Implemented