IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

13,539

matching recommendations
Reset
SIC 308 Miscellaneous Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MS0184 # 08 Y:2001 08 2001 CONDENSE OPERATION INTO ONE BUILDING $56 $25 Not Implemented
MS0184 # 09 Y:2001 09 2001 RECOVER METALS FROM CASTING SAND $9,304 $32 Not Implemented
AS0298 # 01 Y:2001 01 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,767 $11,030 Not Implemented
AS0298 # 02 Y:2001 02 2001 INSTALL SKYLIGHTS $2,099 $11,395 Not Implemented
AS0298 # 03 Y:2001 03 2001 INSTALL OCCUPANCY SENSORS $154 $375 Not Implemented
AS0298 # 04 Y:2001 04 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,334 $90 Not Implemented
AS0298 # 05 Y:2001 05 2001 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $960 $60 Not Implemented
IC0008 # 01 Y:2001 01 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,871 $1,200 Implemented
IC0008 # 02 Y:2001 02 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $418 $0 Implemented
IC0008 # 03 Y:2001 03 2001 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,738 $12,553 Implemented
IC0008 # 04 Y:2001 04 2001 INSTALL OCCUPANCY SENSORS $2,513 $4,800 Not Implemented
IC0008 # 05 Y:2001 05 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $374 $1,462 Not Implemented
IC0008 # 06 Y:2001 06 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,715 $82,109 n/a
IC0008 # 07 Y:2001 07 2001 MODIFY WORKLOAD $68,700 $7,200 Not Implemented
TA0007 # 01 Y:2001 01 2001 INSTALL / REPAIR INSULATION ON STEAM LINES $8,063 $1,741 Implemented
TA0007 # 02 Y:2001 02 2001 INSULATE BARE EQUIPMENT $5,666 $2,886 Implemented
TA0007 # 03 Y:2001 03 2001 TURN OFF EQUIPMENT WHEN NOT IN USE $3,918 $0 Implemented
TA0007 # 04 Y:2001 04 2001 USE SYNTHETIC LUBRICANT $2,175 $0 Not Implemented
TA0007 # 05 Y:2001 05 2001 SHUT OFF AIR CONDITIONING IN WINTER HEATING SEASON $2,036 $0 Implemented
TA0007 # 06 Y:2001 06 2001 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $999 $46 Implemented
TA0007 # 07 Y:2001 07 2001 INSTALL OCCUPANCY SENSORS $303 $313 Implemented
TA0007 # 08 Y:2001 08 2001 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $287 $23 Not Implemented
LM0006 # 01 Y:2001 01 2001 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $14,800 $225 Not Implemented
LM0006 # 02 Y:2001 02 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,389 $450 Implemented
LM0006 # 03 Y:2001 03 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,601 $0 Not Implemented