IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

13,535

matching recommendations
Reset
SIC 308 Miscellaneous Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TN0677 # 03 Y:2000 03 2000 RECOVER AND REUSE WASTE MATERIAL $4,766 $15,450 Not Implemented
TN0677 # 04 Y:2000 04 2000 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $2,820 $1,075 Not Implemented
TN0677 # 05 Y:2000 05 2000 USE DEMAND CONTROLLER OR LOAD SHEDDER $1,440 $3,180 Not Implemented
TN0677 # 06 Y:2000 06 2000 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $1,174 $240 Not Implemented
ME0282 # 01 Y:2000 01 2000 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $80,666 $36,000 Implemented
ME0282 # 02 Y:2000 02 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,760 $8,904 Not Implemented
ME0282 # 03 Y:2000 03 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,228 $250 Implemented
ME0282 # 04 Y:2000 04 2000 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $2,181 $4,360 Not Implemented
ME0282 # 05 Y:2000 05 2000 MINIMIZE WATER USAGE $12,262 $1,000 Implemented
MA0455 # 01 Y:1999 01 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $93,496 $240,000 Not Implemented
MA0455 # 02 Y:1999 02 1999 USE MINIMUM SAFE OVEN VENTILATION $33,134 $16,250 Not Implemented
MA0455 # 03 Y:1999 03 1999 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $24,310 $50,000 Not Implemented
MA0455 # 04 Y:1999 04 1999 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $16,701 $16,000 Not Implemented
MA0455 # 05 Y:1999 05 1999 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,122 $8,000 Not Implemented
HO0217 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,121 $6,030 n/a
HO0217 # 02 Y:2000 02 2000 INSTALL OCCUPANCY SENSORS $725 $200 n/a
HO0217 # 03 Y:2000 03 2000 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,922 $15,200 n/a
HO0217 # 04 Y:2000 04 2000 INSULATE BARE EQUIPMENT $8,538 $1,008 n/a
HO0217 # 05 Y:2000 05 2000 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $60,015 $400,000 n/a
HO0217 # 06 Y:2000 06 2000 IMPROVE SPACE COMFORT CONDITIONING $4,365 $500 n/a
HO0217 # 07 Y:2000 07 2000 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $540 $100 n/a
MS0146 # 01 Y:1999 01 1999 OPTIMIZE PLANT POWER FACTOR $2,236 $2,610 Not Implemented
MS0146 # 02 Y:1999 02 1999 INSTALL TIMERS AND/OR THERMOSTATS $50 $119 Implemented
MS0146 # 03 Y:1999 03 1999 USE PHOTOCELL CONTROLS $276 $222 Not Implemented
MS0146 # 04 Y:1999 04 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $635 $89 Not Implemented