IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

13,566

matching recommendations
Reset
SIC 308 Miscellaneous Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0164 # 03 Y:1999 03 1999 INSTALL OCCUPANCY SENSORS $1,460 $896 Not Implemented
SF0164 # 04 Y:1999 04 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,384 $981 Not Implemented
SF0164 # 05 Y:1999 05 1999 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $6,137 $4,800 Not Implemented
SF0164 # 06 Y:1999 06 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,717 $2,424 Not Implemented
SF0164 # 07 Y:1999 07 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,244 $4,080 Not Implemented
SF0164 # 08 Y:1999 08 1999 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $1,899 $6,500 Not Implemented
SF0164 # 09 Y:1999 09 1999 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $631 $2,500 Not Implemented
UL0216 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,573 $13,951 Not Implemented
UL0216 # 02 Y:1999 02 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,059 $20 Not Implemented
UL0216 # 03 Y:1999 03 1999 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $160 $500 Not Implemented
UL0216 # 04 Y:1999 04 1999 INITIATE A TOTAL QUALITY MANAGEMENT PROGRAM $200,000 $75,000 Not Implemented
KU0513 # 01 Y:1999 01 1999 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $166,610 $85,440 Implemented
KU0513 # 02 Y:1999 02 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,800 $700 Implemented
KU0513 # 03 Y:1999 03 1999 INSULATE BARE EQUIPMENT $3,080 $4,830 Implemented
KU0513 # 04 Y:1999 04 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,450 $1,810 Not Implemented
KU0513 # 05 Y:1999 05 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $950 $1,000 Implemented
KU0513 # 06 Y:1999 06 1999 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $1,250 $1,000 Implemented
KU0513 # 07 Y:1999 07 1999 REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL $23,400 $61,400 Implemented
KU0513 # 08 Y:1999 08 1999 MOVE PRODUCT USING MECHANICAL MEANS $7,210 $2,360 Not Implemented
CO0433 # 01 Y:1999 01 1999 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,630 $1,400 Not Implemented
CO0433 # 02 Y:1999 02 1999 RECOVER WASTE HEAT FROM EQUIPMENT $1,250 $600 Not Implemented
CO0433 # 03 Y:1999 03 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $441 $1,208 Not Implemented
CO0433 # 04 Y:1999 04 1999 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $960 $0 Not Implemented
CO0433 # 05 Y:1999 05 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $460 $420 Not Implemented
CO0433 # 06 Y:1999 06 1999 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $340 $0 Not Implemented