Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
13,566
matching recommendationsSIC | 308 | Miscellaneous Plastics Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
HO0193 # 08 Y:1999 | 08 | 1999 | REDUCE DEFECTS BY REDUCING PRODUCT TIPPING | $2,000 | $10,000 | Not Implemented |
HO0193 # 09 Y:1999 | 09 | 1999 | REDUCE DEFECTS BY REDUCING PRODUCT TIPPING | $5,000 | $3,000 | Not Implemented |
UM0132 # 01 Y:1999 | 01 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,280 | $7,301 | Implemented |
UM0132 # 02 Y:1999 | 02 | 1999 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $680 | $700 | Implemented |
UM0132 # 03 Y:1999 | 03 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $667 | $300 | Implemented |
UM0132 # 04 Y:1999 | 04 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $349 | $1,000 | Implemented |
UM0132 # 05 Y:1999 | 05 | 1999 | RECOVER WASTE HEAT FROM EQUIPMENT | $815 | $990 | Implemented |
UM0132 # 06 Y:1999 | 06 | 1999 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $13,503 | $3,700 | Implemented |
UM0132 # 07 Y:1999 | 07 | 1999 | USE LOW VOC OR WATER BASED PAINT | $5,439 | $500 | Implemented |
UM0132 # 08 Y:1999 | 08 | 1999 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $53,333 | $1,548 | Not Implemented |
SD0212 # 01 Y:1999 | 01 | 1999 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $896 | $0 | Not Implemented |
SD0212 # 02 Y:1999 | 02 | 1999 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $25,608 | $16,000 | Not Implemented |
SD0212 # 03 Y:1999 | 03 | 1999 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $51,749 | $13,000 | Not Implemented |
SD0212 # 04 Y:1999 | 04 | 1999 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $10,696 | $0 | Implemented |
SD0212 # 05 Y:1999 | 05 | 1999 | INSTALL SPECTRAL REFLECTORS / DELAMP | $2,440 | $3,840 | Implemented |
SD0212 # 06 Y:1999 | 06 | 1999 | SHIFT FROM DAYTIME TO NIGHTTIME OPERATION | $990 | $0 | Not Implemented |
SD0212 # 07 Y:1999 | 07 | 1999 | INSTALL SET-BACK TIMERS | $2,140 | $1,000 | Implemented |
SD0212 # 08 Y:1999 | 08 | 1999 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $3,550 | $8,500 | Not Implemented |
SD0212 # 09 Y:1999 | 09 | 1999 | USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES | $1,166 | $0 | Implemented |
SD0212 # 10 Y:1999 | 10 | 1999 | LEASE EQUIPMENT INSTEAD OF PURCHASING | $40,000 | $0 | Not Implemented |
AS0243 # 01 Y:1999 | 01 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,432 | $3,754 | Not Implemented |
AS0243 # 02 Y:1999 | 02 | 1999 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $3,379 | $225 | Not Implemented |
AS0243 # 03 Y:1999 | 03 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,369 | $5,320 | Not Implemented |
AS0243 # 04 Y:1999 | 04 | 1999 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $3,180 | $5,434 | Not Implemented |
AS0243 # 05 Y:1999 | 05 | 1999 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $7,800 | $80 | Implemented |